My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/06/26 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/06/26 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2019 11:29:09 AM
Creation date
11/26/2019 11:24:13 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/26/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Project: Water Main Tmprovement"K'.' and Sewer Main Replacement <br /> Change Order No. 2 <br /> Change Order Effective Date: May 2,2013 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. In full and complete compensation for the changes described in Exhibit A,including all <br /> direct and indirect costs and impacts,the contract price shall be adjusted as described <br /> in this Change Order. <br /> 3. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 4. Contractor waives and releases any and all claims arising out of, or related to,this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including,but <br /> not limited to,claims for equitable adjustment of time and compensation, delay,impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest,dispute claim, or contract Claim that ends <br /> after the date of this Change Order,but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Depal.latent Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> )411 <br /> _ Jo <br /> Datelip_4 Date: I f Date: Date: / <br /> V7' <br /> Page 2 of 4 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.