Project: Water Main Improvement"K" and Sewer Main Replacement <br /> Change Order No. 2 <br /> Change Order Effective Date:May 2, 2013 <br /> CONTRACTOR` <br /> By iiiaDate: lD (� <br /> ( 13NV/Officer <br /> Exhibit A—Description of Changed Work: <br /> Change Order#2 adds 2 new bid items and modifies one existing bid item on the contract as identified <br /> below. <br /> Added Bid Items <br /> Schedule A <br /> Bid Item 62--Revised HMA Patch Price. Add new bid item 62 entitled, "Revised HMA Patch <br /> Price", at the unit price of$64.29/Ton,for a quantity increase of 1,204.12 tons of"Revised HMA <br /> Patch Price",resulting in a contract price increase of$77,412.87. <br /> Schedule B <br /> Bid Item 36—Revised HMA Patch Price. Add new bid item 36 entitled,"Revised HMA Patch <br /> Price", at the unit price of$64.29/Ton, for a quantity increase of 345.92 tons of"Revised HMA Patch <br /> Price",resulting in a contract price increase of$22,239.20. <br /> Modified Bid Item under Schedule A <br /> Bid Item 5—Traffic Control Labor. Modify existing bid item S entitled, "Traffic Control Labor",by <br /> adding 550 hours of traffic control labor, at the unit price of$49.00/hour,resulting in a$26,950.00 <br /> increase to the contract. <br /> The total net price increase cost as a result of adding 2 new bid items and moding one existing bid <br /> item of this contract is$126,602.07. <br /> Exhibit B—Justification: <br /> Added Bid Items <br /> Schedule A <br /> Bid Item 62—Revised HMA Patch Price. This bid item is being added to provide an equitable <br /> adjustment per WSDOT Standard Specification 1-09.4,due to the decrease in tonnage of HMA,CL %- <br /> Page 3 of 4 <br /> 4 <br />