Drainage Report—Revision 1 <br /> Boeing Everett—Rail Spur Parking Lot September 26,2013 <br /> when sediment has filled one-third of the available storage (unless a different standard is <br /> specified by the product manufacturer). The following inlet protection measures will be applied <br /> on this project: <br /> • BMP E3.30: Storm Drain Inlet Protection <br /> 9.9 ESC Requirement#9: Underground Utility Construction <br /> The construction of underground utility lines shall be subject to the following criteria: <br /> 1. Where feasible, no more than 500 feet of trench shall be opened at one time. <br /> 2. Where consistent with safety and space considerations, excavated material shall be placed <br /> on the uphill side of trenches. <br /> 3. Trench dewatering devices shall discharge into a sediment trap or sediment pond. <br /> 9.10 ESC Requirement#10: Construction Access Routes <br /> Construction vehicle access will be limited to one entry inside the Boeing security fence on the <br /> east side of the site. If sediment is tracked offsite, roads/accesses shall be cleaned thoroughly at <br /> the end of each day, or more frequently during wet weather, if necessary to prevent sediment <br /> from entering drainage inlets. Sediment shall be removed from roads by shoveling or pickup <br /> sweeping and shall be transported to a controlled sediment disposal area. Street washing will be <br /> allowed only after sediment is removed in this manner. Street wash wastewater shall be <br /> controlled by pumping back on site to an approved infiltration facility. BMPs relevant to <br /> establishment of construction access for this project may include: <br /> • BMP E2.10: Stabilized Construction Entrance and Tire Wash <br /> • BMP E2.15: Construction Road Stabilization <br /> 9.11 ESC Requirement#11: Removal of Temporary BMPs <br /> All temporary erosion and sediment control BMPs shall be removed within 30 days after final <br /> site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped <br /> sediment shall be removed or stabilized onsite. Disturbed soil areas resulting from removal shall <br /> be permanently stabilized. <br /> 9.12 ESC Requirement#12: Dewatering Construction Sites <br /> If dewatering devices are required,they shall discharge into a sediment trap or sediment pond. <br /> 9.13 ESC Requirement #13: Control of Pollutants other than Sediment on Construction <br /> Sites <br /> All pollutants other than sediment that occur onsite during construction shall be handled and <br /> disposed of in a manner that does not cause contamination of stormwater. <br /> 9.14 ESC Requirement#14: Maintenance <br /> All temporary and permanent erosion and sediment control BMPs shall be maintained and <br /> repaired as needed to assure continued performance of their intended function. All maintenance <br /> and repair shall be conducted in accordance with an approved manual. <br /> DCG, Inc. Page 10 of 11 <br />