My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-YD 2019-11-27
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-YD
>
3003 W CASINO RD BLDG 40-YD 2019-11-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 1:59:03 PM
Creation date
11/27/2019 1:51:47 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-YD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage Report—Revision 1 <br /> Boeing Everett—Rail Spur Parking Lot September 26,2013 <br /> 9.15 ESC Requirement#15: Financial Liability <br /> Performance bonding, or other appropriate financial instruments, shall be required for all projects <br /> to ensure compliance with the approved erosion and sediment control plan. <br /> 10. BOND QUANTITIES WORKSHEET, RETENTION/DETENTION FACILITY <br /> SUMMARY SHEET AND SKETCH,AND DECLARATION OF COVENANT <br /> 10.1 Bond Quantities Worksheet <br /> The bond quantities for the project will be calculated in the City's Bond Quantities Worksheet <br /> which will be submitted separately at a later time if required by the City review engineer. <br /> 10.2 Detention Facility Summary Sheet and Sketch <br /> A detention facility summary sheet has been completed and attached as APPENDIX G. See the <br /> project plans submitted separately for detailed drawings of the collection and conveyance <br /> system. <br /> 10.3 Declaration of Covenant <br /> If the City requires a drainage facility/access covenant or agreement then it will be provided <br /> under separate cover. <br /> 11. MAINTENANCE AND OPERATIONS MANUAL <br /> The Boeing Company will be responsible for the maintenance of the proposed onsite storm <br /> systems.An operation and maintenance manual for all proposed stormwater facilities and BMPs <br /> is included in APPENDIX B of this report. <br /> DCG, Inc. Page 11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.