Laserfiche WebLink
Drainage Report-Revision 1 <br /> Boeing Everett-Rail Spur Parking Lot September 26,2013 <br /> TABLE OF CONTENTS <br /> 1. Project Overview 1 <br /> 2. Project Plans 1 <br /> 3. Preliminary conditions summary 2 <br /> 3.1 Minimum Requirements 3 <br /> 3.1.1 Minimum Requirement#1: Erosion and Sediment Control 3 <br /> 3.1.2 Minimum Requirement#2: Preservation of Natural Drainage Systems 4 <br /> 3.1.3 Minimum Requirement#3: Source Control of Pollution 4 <br /> 3.1.4 Minimum Requirement#4: Runoff Treatment BMPs 4 <br /> 3.1.5 Minimum Requirement#5: Streambank Erosion Control 4 <br /> 3.1.6 Minimum Requirement#6: Wetlands 4 <br /> 3.1.7 Minimum Requirement#7: Water Quality Sensitive Areas 4 <br /> 3.1.8 Minimum Requirement#8: Off-Site Analysis and Mitigation 4 <br /> 3.1.9 Minimum Requirement#9: Basin Planning 4 <br /> 3.1.10 Minimum Requirement#10: Operation and Maintenance 5 <br /> 3.1.11 Minimum Requirement#11: Financial Liability 5 <br /> 4. Off-Site Analysis 5 <br /> 5. Analysis and Design of proposed Stormwater Runoff treatment and Control 5 <br /> 5.1 Developed Hydrology 6 <br /> 5.2 Stormwater Control Scenario 6 <br /> 5.3 Water Quality Modeling 6 <br /> 5.4 Proposed Facilities Summary 7 <br /> 6. Special Reports and Studies 8 <br /> 7. Basin and Community Planning Areas 8 <br /> 8. Other Permits 8 <br /> 9. Erosion and Sediment Control plan 8 <br /> 9.1 ESC Requirement#1: Stabilization and Sediment Trapping 8 <br /> 9.2 ESC Requirement#2: Delineate Clearing and Easement Limits 8 <br /> 9.3 ESC Requirement#3: Protection of Adjacent Properties 9 <br /> 9.4 ESC Requirement#4: Timing and Stabilization of Sediment Trapping Measures 9 <br /> 9.5 ESC Requirement#5: Cut and Fill Slopes 9 <br /> 9.6 ESC Requirement#6: Controlling Off-site Erosion 9 <br /> 9.7 ESC Requirement#7: Stabilization of Temporary Conveyance Channels and Outlets 9 <br /> 9.8 ESC Requirement#8: Storm Drain Inlet Protection 9 <br /> 9.9 ESC Requirement#9: Underground Utility Construction 10 <br /> 9.10 ESC Requirement#10: Construction Access Routes 10 <br /> 9.11 ESC Requirement#11: Removal of Temporary BMPs 10 <br /> 9.12 ESC Requirement#12: Dewatering Construction Sites 10 <br /> 9.13 ESC Requirement#13: Control of Pollutants other than Sediment on Construction Sites <br /> 10 <br /> 9.14 ESC Requirement#14: Maintenance 10 <br /> 9.15 ESC Requirement#15: Financial Liability 11 <br /> 10.Bond Quantities Worksheet, Retention/Detention Facility Summary Sheet and Sketch, and <br /> Declaration of Covenant 11 <br /> 10.1 Bond Quantities Worksheet 11 <br /> 20130926_Drainage Report_Boeing Everett_Gate E-70 Parking lot_Revision 1.doc Page iii <br />