Laserfiche WebLink
Drainage Report—Revision 1 <br /> Boeing Everett-Rail Spur Parking Lot September 26,2013 <br /> 10.2 Detention Facility Summary Sheet and Sketch 11 <br /> 10.3 Declaration of Covenant 11 <br /> 11. Maintenance and Operations Manual 11 <br /> APPENDICES <br /> APPENDIX A StormShed Modeling Calculations <br /> APPENDIX B Operation and Maintenance Manual <br /> APPENDIX C Temporary Erosion and Sediment Control Plan <br /> APPENDIX D Site Plans <br /> APPENDIX E Conveyance Calculations <br /> APPENDIX F 1992 Storm Drainage Calculations for Rail Receival Facility (Building 40-55) <br /> Site Displacement Package — Stormwater Detention Pond and Water Quality <br /> Swale Design <br /> APPENDIX G Detention Facility Summary Sheet <br /> LIST OF TABLES <br /> TABLE 1 Project Site Area and Size of Improvements 3 <br /> TABLE 2 StormShed Water Quality Treatment Flow Rates 7 <br /> TABLE 3 Water Quality Facilities Sizing Summary 7 <br /> LIST OF FIGURES <br /> FIGURE 1 Site Location 1 <br /> FIGURE 2 Project Basin Delineation 2 <br /> 20130926_Drainage Report_Boeing Everett_Gate E-70 Parking lot_Revision 1.doc Page iv <br />