My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-YD 2019-11-27
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-YD
>
3003 W CASINO RD BLDG 40-YD 2019-11-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 1:59:03 PM
Creation date
11/27/2019 1:51:47 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-YD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage Report— 1 ,)K <br /> Boeing Everett— Rail Spur Parking Lot September 26, 2013 <br /> 1. PROJECT OVERVIEW <br /> The project involves the construction of a new 104,823 SF concrete parking lot in an existing <br /> grass field just south of Gate E-70 at the Boeing Everett Facility. The new concrete parking lot <br /> will discharge to an existing stormwater detention pond to the west of Perimeter Road and will <br /> not require additional flow control or water quality facilities. The project will adhere to the <br /> requirements stipulated in the 1992 Department of Ecology Stormwater Management Manual for <br /> the Puget Sound Basin (hereafter referred to as the Stormwater Manual). <br /> Construction will take place on a previously undeveloped site within Boeing's Everett campus <br /> and therefore is classified as new development per Volume I, Chapter I-2, Section I-2.4.1 of the <br /> Stormwater Manual. This section requires that all new development that includes the creation or <br /> addition of 5,000 square feet or greater of new impervious surface area and/or land disturbing <br /> activity of one acre or greater must comply with Minimum Requirements #1 through #11 and <br /> prepare a Stormwater Site Plan. The Minimum Requirements are addressed in Section 5 of this <br /> report. <br /> PROJECT LOCATION <br /> • 11114141P <br /> • Jr0 <br /> BOEING-EVERETT � ^ ' ` , <br /> • JAPANESE GULCH <br /> a n I'I „ . SR 526 <br /> FIGURE 1 Site Location <br /> 2. PROJECT PLANS <br /> The project plans, designed in accordance with the Stormwater Manual, have been submitted <br /> under separate cover. See APPENDIX C for the TESC Plan and APPENDIX D for the Site <br /> Plans. <br /> DCG, Inc. Page 1 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.