Laserfiche WebLink
l � <br /> Meg Haley <br /> From: Meg Haiey <br /> Sent: VJednesday, October 24, 2007 9:52 AM �0��_�7 � <br /> To: 'Tom Griffin' <br /> Cc: 'Sandra-ComcasP;Tony Lee; Ted Budden <br /> Subject: RE:2701 Wetmore Bldg. <br /> Tom, <br /> In regards to the additional work referenced in your e-mail, any new work on t:�e building <br /> outside of the scope of the permit for the toilet rooms will be required to be submitted <br /> under a new permit. All work not under permit should stop until a permit for the work is <br /> submitted and issued. <br /> -Meg <br /> -----Original Message----- <br /> From: Tom Griffin [mailto:tom.capitalarchitectsescomcast.netJ <br /> Sent: Tuesday, October 23, 2007 3 :49 PM <br /> To: Meg Haley <br /> Cc: Sandra Alder <br /> Subject: 2701 Wetmore Bldg. <br /> Meg, <br /> I have attached a revised cover sheet showing the revised construction type for the <br /> building. Please let me know if this is not sufficient for what we were talking about <br /> yesterday, and then I know we will wait until you have a chance to talk with Ted to see <br /> what else will be needed to allow the permit to go forward. <br /> By the way, the buildingc owners are also now wanting to enlarge an interior door passage <br /> (witlt no door) that is located right near the front entrance on Wetmore Ave. They will <br /> have to remove a portion of an exicting concrete wall and will obtain a letter from the <br /> structural engineer who is familiar with the building to OK this structurally. <br /> They indicated that they would like to attach this work to the current permit (for the <br /> toilet rooms) . I want to check with you that this could be done, or it should be included <br /> as part of the additional T.I. permit applications that are needed for the other framing <br /> work tl�at has already been started. Thanks Meg. <br /> Tom Griffin <br /> Capital Architects, Inc. <br /> (425) 317-8017 <br /> 1 <br />