My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/11/27 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/11/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:31:25 AM
Creation date
12/3/2019 10:23:54 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> - City of Everett review period is two(2)weeks <br /> Deliverables: <br /> - Electronic copy(MS Word)of Draft Technical Memorandum <br /> - Electronic copy(PDF)of Final Technical Memorandum <br /> • <br /> TASK 4—COVER REPAIRS AND VENTILATION IMPROVEMENT DEIGN estimated at 51 182 <br /> CG ENGINEERING: <br /> CG Engineering will provide structural engineering neering for therepair w ork and work incidental to the ventilation <br /> 4.1 Design kickoff meeting at Public Works office <br /> 4.2 50%Design Documents(targeted submittal date:1/31/20) <br /> 4.3 90%Design Documents(targeted submittal date:3/27/20) <br /> 4.4 Bid-Ready(Final)Design Documents(targeted submittal date:5/1/20) <br /> Assumptions: <br /> - <br /> Front end specifications will be prepared by the City. CG Engineering <br /> - responsible for preparation of the technical specifications. <br /> All required permits will be obtained by the City or ene g ermg and its subconsultants will be <br /> - Final Design plans will be used for bidding g ral contractor <br /> Deliverables: <br /> - <br /> Plans, Cost Estimate and technical Specifications in PDF format ormat at the 50%,90%,and Final stages of <br /> MURRAYSMITH.• <br /> Produce Final design plans and specifications for the project <br /> 4.1 50%Design Plans and Specifications. Specifications will be in CSI format. <br /> 4.2 90%Design Plans and Specifications. Specifications will be in CSI format. <br /> 4.3 Bid-Ready(Final) Design Plans and Specifications. Specifications will be in CSI format. <br /> 4.4 Construction Cost Estimates(50%,90%and Bid-Ready design). <br /> 4.5 Construct ability Reviews <br /> TASK 5—BID PHASE SUPPORT estimated at 10 037 <br /> CG ENG/NEERING: <br /> CG Engineering will provide consultation to the City staff to assist with <br /> • <br /> elements of the project that pertain to our scope of work. the bidding phase for the <br /> 5.1 Attend pre-bid conference <br /> 5.2 Respond to bid phase RFIs(not to exceed 8) <br /> 5.3 Prepare one addendum <br /> 5.4 Maintain a written record of bid-phase communications <br /> Assumptions: <br /> - The City will be responsible for preparation and advertisement of <br /> all bid documents. <br /> Deliverables: <br /> - Written RFI responses, if necessary <br /> - Plans for Addendum in PDF format, if necessary <br /> ExhibitA—Scope of Work 3.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.