Laserfiche WebLink
TASK 2 <br /> —.DATA COLLECTION AND REVIEW estimated at 7 613 . <br /> CG ENGINEERING: staff to obtain relevant data to assistthe ventilation n subconsultant <br /> withCG Engineering eval will worknwith gatherCiadditional . <br /> their evaluation and information for the structural <br /> • <br /> 2.1 Data request and review <br /> 2.2 Site visit • , <br /> Assumptions: <br /> - City will provide access inside the reservoir via aore excluded <br /> t <br /> Destructive investigation and materials testing <br /> - <br /> Deliverables: the City. <br /> - Photos and field notes if requested by. evaluation <br /> • <br /> MURRAY2.1 Data <br /> Murraysmith will gather and review relevant datato <br /> of this the evaluation <br /> including <br /> reports will be requested and reviewed as p <br /> 2.1 Data request and review data collection <br /> tasks. Several documents and rep operational SCADA data,and other maintenance records from the City <br /> and the City of Everett during <br /> • <br /> reservoir and site record drawings, ri ect <br /> of Everett.Murraysmith will ste with CG gathered forghe Engineering <br /> _ to ensure all necessary information <br /> 2.2 Site visit(one site visit,up to two Murraysmith staff) <br /> Deliverables: <br /> - Electronic copies of formal"Data Request" <br /> TASK 3—RESERVOIR VENTILATION EVALUATION estimated at 10 430 <br /> CG ENGINEERING: ventilation subconsultant and review their technical memorandum. <br /> CG Engineering will manage the <br /> 3.1 Management of ventilationron al ion subconsultant <br /> • 3.2 Review of technical m <br /> Assumptions: <br /> ubconsultant and City staff will be required to review technical <br /> - Qpe meeting with ventilation s <br /> memorandum. <br /> Deliverables: <br /> - 5ubc°ns <br /> ultant will prepare technical memorandum for City review. <br /> previous tasks to evaluate and <br /> MURRAYSMITH: <br /> Ventilation Evaluation. Review data and site visit notes collected in p <br /> 3.1 <br /> options or other solutions to reduce the humid environment above the <br /> n <br /> determine potential ventilation <br /> • that summarizes relevantinformation <br /> k orThe <br /> reservoir's water surface. Prepare a brief technical memorandum performed in prior <br /> 3.2 Technical Memorandum. <br /> and the results of work for theoproject• <br /> • <br /> and data collected from records and site v'is'its, <br /> technical memorandum will include recommendations and next step <br /> Page.2.of$ <br /> Assumptions: <br /> • <br /> • ExhibitA—Scope of Work <br /> • <br /> 31 <br />