My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10200 19TH AVE SE Geotech Report 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
10200
>
Geotech Report
>
10200 19TH AVE SE Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 11:59:32 AM
Creation date
12/4/2019 11:27:09 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10200
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � , • <br /> REPORT <br /> GEOTECIiNICAL ENGINEERING SERVICES <br /> PROPOSED COSTCO WHOLESALE WAREHOUSE <br /> � EVERETT, WASHINGTON <br /> FOR <br /> ` COSTCO WHOLESALE <br /> 1 INTRODUCTION <br /> � � 'il�is repoR presents the resulGc of our geotechnical engineering services for the proposed <br /> � ' Costco Wholesale site to be located between 19th Avenue Southeast (SR 527) and Interstate 5 <br /> aear lOSth Street Southeast in Everett, W�shington. The location of the siu and the gena�al <br /> configuration of the property aze shown on the Vicinity Map and the Site Plan, Figures 1 and 2, <br /> respectively. ' <br /> Our understanding of the project is based on discussions with and site inforni�tion provided <br /> � by Mr. Chandler Stever with the Malvanny Partnership. The proposed development consists of <br /> an approximately 156,000-squaze-foot Costco wazehouse along the west side of the property,and <br /> , the remainder of the site will be for pazking, landscaping, and storm water management. 14e <br /> ' understand the wazehouse will be of steel frame and meta] clad construction. Design loads for � <br /> �� the proposed waze,tiouse aze expec;ted to include wall loads on the order of 3 klf (kips per <br /> � lineaz foot), column loads on the order of 100 kips, and floor loads up to 500 psf(pounds per <br /> I ' square foot). Finished fleor elevation for the warehouse will be at Elevation 570 feet, which will <br /> � <br /> require cuts on the order of 10 feet along the south side of the �roposed building footprint and <br />' fills up to 6 feet in height near the noitheast corner of the building fuc;forint. Preliminary p12ns <br /> 1 , indicate that storm water witl be managed with the use of detentic�n and water quality ireatment <br /> ponds. 11�ese ponds wiU be locatefl south of the proposed building footpeint as noted �n <br /> Figure 2. <br /> • Several small wetland azeas have been identified on the site. hiost of these wetland azeas <br /> will be left in-place and enhanced with the development as proposed. However, two wetland <br /> azeas near ti�e northern mazgin of the property and one near the northwest corner of the proposed <br /> building footprint a� •:� be filled. <br /> SCOPE <br /> The purpose of this study is to provide design level geotechnical information for <br /> development of the proposed Costco Wholesale project. Our specific scop:of services includes <br /> the following tasks: <br /> 1. Explure the subsur:acs soil and ground water conditions across the site by eaccavaring <br /> 12 test pits to depths ranging from 4 to 12 feet with a rubber-tired bac.khoe. <br /> 2. Evaluate pertinent physical and engineerir.g chazacteristics of the foundation soils bazed on <br />� � laboratory tescs performe,i on samples obiained frem the test pits. <br /> G c o E n y i n e e r � 1 Fle No.0975-0l7•R73J062997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.