Laserfiche WebLink
8 <br /> Everett Road closure/access times estimated <br /> Tuesday/Wednesday-Equipment trailer arrives in Everett-to be stored in parking <br /> lot between Oakes and Rockefeller <br /> Thursday-Bubble Run TM Staff arrives in Everett <br /> Friday 10AM-Road closer of Oakes and Rockefeller-between Hewitt and Wall <br /> Set up begins,receiving of shipment and rentals <br /> Friday 6PM-Road closure of Colby between 25th and 24th for bog 1&4 set up <br /> Road closure of Colby between 19th and 18th for bog 2&3 set up <br /> Saturday 4AM-Road closure of Wall between Rockefeller and Oakes for final finish <br /> line set up. Start course closures for runners. <br /> 9AM-First wave goes out onto Hewitt-approximately 500 runners start <br /> every 3-5 minutes with the last wave going out at 9:30AM. <br /> 10:15-Last runner has gone through turn around and is back on Colby.16th <br /> can reopen at this time. <br /> 10:30-Last runner has gone though bog 3 -all east west cross streets N of <br /> 18th can reopen. <br /> 10:40-Last runner has gone through bog 4-all east west cross streets <br /> between 19th and 24th can reopen. <br /> *The blocks of Colby that have bogs will be packed and cleaned as last <br /> runner goes through-We estimate to be entirely off the roads by 11:15.After the <br /> last runner clears an intersection,East West traffic can cross Colby.Local access of <br /> residents acceptable on Colby with exception of 18th-19th and 24th and 25th while <br /> staff is still on those blocks. <br /> 11:10-Last runner is at the finish line.All roads are open with the exception <br /> of Wall between Rockefeller and Oakes (finish line equipment is still on road) and <br /> the staging roads of Oakes and Rockefeller between Hewitt and Wall (still <br /> equipment and participants in the road). <br /> 12:30 Festival closes-participants move to Comcast block party on Hewitt. <br /> Clean up of staging roads begin. <br /> 3p-All Bubble Run Equipment and staff are off site.All roads are opened. <br /> Equipment Trailer to be picked up Monday. <br /> 21 <br />