Laserfiche WebLink
•Run Date: 6/13/2013 <br /> • <br /> City of Everett-Public Works Department Cutoff Date: 6/7/2013 <br /> Contract Estimate Voucher <br /> Time: 11:13 AM For Work Order#34436 <br /> Contractor: SRV CONSTRUCTION,INC. <br /> Project: 289 Estimate#13 P 0 BOX 481 <br /> WATER MAIN IMPROVEMENT K OAK HARBOR WA 98277 <br /> WO 3443B BID:$500,124.20 <br /> TOTAL BID:$2,496,273.27 • <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 34,000.00 1.00 1.0000 1.0000 0.0000 34,000.00' 34,000.00 0.00 <br /> 0002 Surveying LS 1,650.00 1.00 1.0000 1.0000 0.0000 1,650.00 1,650.00 0.00 <br /> 0003 Force Account FA 1.00 10,000.00 9,235.0600 9,235.0600 0.0000 9,235.06 9,235.06 0.00 <br /> 0004 Traffic Control LaborHR 49.00 510.00 694.0000 694.0000 0.0000 34,006.00 34,006.00 0.00 . <br /> 0005 Maintenance&Protection of Traffic Control LS 2,200,00 1.00 1.0000 1.0000 0.0000 2,200.00 2,200.00 0.00 <br /> 0006 Removal of Asphalt Concrete Pavement SY 5.90 1,300.00 1,524.1100 1,524.1100 0.0000 8,992.25 8,992.25 0.00 <br /> 0007 Street Cleaning&Sweeping HR 100.00 10.00 70.5000 70.5000 0.0000 7,050.00 7,050.00 0.00 <br /> 0008 Trench Excavation Safety Systems LS 1,050.00 1.00 1.0000 1.0000 0.0000 1,050.00 1,050.00 0.00 <br /> 0009 Temporary Erosion&Sedimentation Control LS 1,100.00 1.00 1.0000 1.0000 0.0000 1,100.00 1,100.00 0.00 <br /> 0010 Saw-Cut ACP,Final Joint up to 6-Inch Thick LF 0.92 2,800.00 3,765.0000 3,765.0000 0.0000 3,463.80 3,463.80 0.00 CT) <br /> ch <br /> 0011 Saw-Cut ACP,Final Joint Additional 1-Inch LF 0.30 2,100.00 1,137.0000 1,137.0000 0.0000 341.10 341.10 0.00 <br /> Thick <br /> 0012 Crushed Surfacing Top Course TN 34.00 1,040.00 541.0300 541.0300 0.0000 18,395.02 18,395.02 0,00 <br /> 0013 Planing Bituminous Pavement SY 2.40 4,400.00 4,400.0000 4,400.0000 0.0000 10,560.00 10,560.00 0.00 <br /> 0014 HMA,CI 1/2"PG 64-22 For Trench Patch TN 96.00 450.00 345.9200 345.9200 0.0000 33,208.32 33,208.32 0.00 <br /> 0015 HMA CL 1/2"PG 64-22 For Overlay TN •90.00 500.00 593.3700 593.3700 0.0000 53,403.30 53,403.30 0.00 <br /> 0016 Temp.Pavement Patch TN 55.00 210.00 105.0000 0.0000 105.0000 5,775.00 0.00 •5,775.00 <br /> 0017 Gravel Borrow TN 15.45 • 3,020.00 5,211.9700 5,211.9700 0.0000 80,524.94 80,524.94 0.00 <br /> 0018 Controlled Density Fill CY 163.00 20.00 18.0000 18.0000 0.0000 2,934.00 2,934.00 0.00 <br /> 0019 PerfCPEP Drain Pipe,6-Inch Diam. LF 14.00 140.00 140.0000 140.0000 0.0000 1,960.00 1,960.00 0.00 <br /> 0020 Foundation Material,Class A or B TN 38.00 250.00 90.0500 90.0500 0.0000 3,421.90 3,421.90 0.00 , <br /> 0021 PVC SDR 35 Sanitary Sewer Pipe,8-Inch LF 56.00 1,065.00 1,054.0000 1,054.0000 0.0000 59,024.00 59,024.00 0.00 • <br /> Diam. <br /> 0022 Manhole,48-Inch Diam,Type 1 EA 4,160.00 4.00 3.0000 3.0000 0.0000 12,480.00 12,480.00 0.00 <br /> 0023 Cut-In Manhole,48-Inch Diam.Type 1 EA 6,025.00 1.00 1.0000 1.0000 0.0000 6,025.00 6,025.00 0.00 <br /> 0024 Manhole Addtl.Height,48-Inch Diam.Type 1 VF 78.00 20.00 16.7500 16.7500 0.0000 1,306.50 1,306.50 0.00 <br /> 0025 Outside Drop Manhole Connection EA 2,050.00 1.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0026 Side Sewer Replacement EA 2,980.00 16.00 21.0000 21.0000 0.0000 62,580.00 62,580.00 0.00 <br />