Laserfiche WebLink
Run Date: 6/13/2013 City of Everett-Public Works Department Cutoff Date: 6/7/2013 <br /> Time: 11:13 AM Contract Estimate Voucher <br /> Project: 289 For Work Order#3443B Contractor: SRV CONSTRUCTION,INC. <br /> WATER MAIN IMPROVEMENT K Estimate#13 <br /> P O BOX 481 <br /> • WO 34436 BID:$500,124.20 OAK HARBOR WA 98277 <br /> TOTAL BID:$2,496,273.27 <br /> Unit Plan Total Previous Present Total Previous Present ' <br /> Item II Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0027 Side Sewer Replacmnt with Double Cleanout EA 3,060.00 7.00 2.0000 2.0000 0.0000 6,120.00' 6,120.00 0.00 <br /> 0028 Temp Bypass Pumping LS 13,300.00 1.00 1.0000 1.0000 0.0000 13,300.00 13,300.00 0.00 <br /> 0029 Topsoil,Type A&Seeding SY 15.00 50.00 1,156.3400 1,156.3400 0.0000 17,345.10 17,345.10 0.00 •• <br /> 0030 Surface Restoration LS 2,800.00 1.00 1.0000 1.0000 0.0000 2,800.00 2,800.00 0.00 <br /> 0031 Monument Cases EA 1,050.00 1.00 0.0000 ' 0.0000 0.0000 0.00 0.00 0.00 <br /> 0032 Concrete Sidewalk Restoration SY 123,00 15.00 56.0500 56.0500 0.0000 6,894.15- 6,894.15 0.00 <br /> 0033 Concrete Curb or Curb&Gutter Restoration LF 78.00 20.00 5.0000 5.0000 0.0000 390.00 390.00 0.00 <br /> 0034 Temp Pavement Marking LS 1,650.00 1.00 1.0000 1.0000 0.0000 1,650.00 1,650.00 0.00 <br /> 0035 Permanent Pavement Marking LS 6,000.00 1.00 1.0000 1.0000 0.0000 6,000.00 6,000.00 0.00 <br /> O <br /> 0036 Revised HMA Patch TN 64.29 345.92 345.9200 0.0000 345.9200 22,239.20 0.00 22,239.20 L() <br /> Work Order Totals: 531,424.63 503,410.44 28,014.20 <br /> • <br />