My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/09/25 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/09/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2019 11:30:34 AM
Creation date
12/5/2019 11:28:07 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/25/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Everett Courts DLR Group project number <br /> 73-11105-00 <br /> Yes ? No <br /> 10.25 <br /> Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required C <br /> Y Prereq 2 Minimum Energy Performance(10%New Bldgs or 5%Existing Bldg Renovation Required D <br /> Prereq 3 Fundamental Refrigerant Management Required D <br /> 6 13 Credit 1 Optimize Energy Performance 1 to 19 D <br /> Improve by 12%for New Buildings or 8%for Existing Building Re 1 <br /> Improve by 14%for New Buildings or 10%for Existing Building R 2 <br /> _Improve by 16%for New Buildings or 12%for Existing Building R 3 <br /> _Improve by 18%for New Buildings or 14%for Existing Building R 4 <br /> Improve by 20%for New Buildings or 16%for Existing Building R 5 <br /> 6 Improve by 22%for New Buildings or 18%for Existing Building R 6 <br /> Improve by 24%for New Buildings or 20%for Existing Building R 7 <br /> Improve by 26%for New Buildings or 22%for Existing Building R 8 <br /> _Improve by 28%for New Buildings or 24%for Existing Building R 9 <br /> Improve by 30%for New Buildings or 26%for Existing Building R 10 <br /> Improve by 32%for New Buildings or 28%for Existing Building R 11 <br /> Improve by 34%for New Buildings or 30%for Existing Building R 12 <br /> _Improve by 36%for New Buildings or 32%for Existing Building R 13 <br /> Improve by 38%for New Buildings or 34%for Existing Building R 14 CO <br /> Improve by 40%for New Buildings or 36%for Existing Building R 15 <br /> Improve by 42%for New Buildings or 38%for Existing Building R 16 <br /> Improve by 44%for New Buildings or 40%for Existing Building R 17 <br /> Improve by 46%for New Buildings or 42%for Existing Building R 18 <br /> Improve by 48%for New Buildings or 44%for Existing Building R 19 <br /> 7 Credit 2 On-Site Renewable Energy 1 to 7 n/a <br /> -1%Renewable Energy 1 <br /> 3%Renewable Energy 2 <br /> 5%Renewable Energy 3 <br /> 7%Renewable Energy 4 <br /> 9%Renewable Energy 5 <br /> 11%Renewable Energy 6 <br /> -13% Renewable Energy 7 <br /> 2 Credit 3 Enhanced Commissioning 2 C <br /> 2 Credito Enhanced Refrigerant Management 2 D <br /> 3 Credit 5 Measurement&Verification 3 n/a <br /> 2 Credit 6 Green Power 2 n/a <br /> Yes ? No <br /> �"� 9/3/2013 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.