Laserfiche WebLink
DLR Group project number <br /> .....# Everett Courts 73-11105-00 <br /> ii`.il r� t(r-li ;i,, <br /> 6 18 _ -- -- - - - ----- - --- - <br /> y Required D <br /> Prereq 1 Storage&Collection of Recyclables1 3 D <br /> 13 I Credit 1.1 •Building Reuse, Maintain Existing Walls, Floors&Roof n/a1 <br /> Reuse 55% <br /> Reuse 75% 2 <br /> Reuse 95% 3 3 <br /> 1 n <br /> /a <br /> 1 to 2 n <br /> Credit 1.2 Building Reuse,Maintain 50%of Interior Non-Structural Elements <br /> 2 Credit 2 Construction Waste Management 2 <br /> C <br /> 50%Recycled or Salvaged <br /> 2 75%Recycled or Salvaged 2 <br /> I I 1 2 I Credit 3 Materials Reuse 1 to 2 n/a1 <br /> i Reuse 5% <br /> Reuse 10% 2 <br /> 11 I 11 I Credit 4 Recycled Content 1 to 2 C <br /> 1 10%of Content <br /> 20%of Content 2 <br /> I 1 I 11 I Credit 5 Regional Materials 1 to 2 C <br /> 1 10%of Materials <br /> 20%of Materials 2 <br /> Credits Rapidly Renewable Materials 1 n/a 00 <br /> I1 1 C <br /> Credit 7 Certified Wood <br /> 3of5 <br /> 9/3/2013 <br />