My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1720 75TH ST SW ELCON CORPORATION 2018-01-02 MF Import
>
Address Records
>
75TH ST SW
>
1720
>
ELCON CORPORATION
>
1720 75TH ST SW ELCON CORPORATION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2021 8:48:35 AM
Creation date
12/10/2019 2:57:26 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1720
Tenant Name
ELCON CORPORATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2001 <br />,ton State Nonresidential Enerav Code Compli• ^e Form <br />9%II Wasn. aWm Stele Nmles,de^6sl Gnerpy Cade <br />June <br />Project Info <br />Project Address 7 OM 114 <br />Date 8/31/04 <br />WAfl <br />• L <br />For Building Dept. Use <br />U "gJlC) <br />Applicant Name: set -Aire meeting, Inc. <br />Applicant Address, 7172 Division street <br />Applicant Phone: U601 77I-4652 <br />Project Description <br />Briefly describe mechanical <br />system type and features. <br />El Includes Plans <br />must contain notes requheng compliance with commissioning requirements - Section 1416 <br />Q Simple System O Complex System O Systems Analysis <br />Compliance Option (See Decision Flowchart (over) for qualifications. Use separate MECH•SUM for simple 8 complex systems I <br />.quipmen t Schrd u I es <br />The following information is required to be incorporated with the mechanical equipment schedules on the <br />plans. For projects without plans, fill in the required information below. <br />Cooling Equipment Sichedule <br />litkw) <br />Brand Name' <br />Model No.' <br />Capacity° <br />Btmh <br />Total CFM <br />OSA CFM <br />or Econo? <br />SEER <br />or EER <br />IPLV° <br />kw„ l ini <br />t:(t <br />,I I.-n <br />)ter <br />2'1 y) <br />SA <br />Heatin r Equipment Schedule <br />Equip. <br />to <br />Brand Name' <br />Model No.' <br />Capacity <br />Btu/h <br />Total CFM <br />OSA chill <br />or Econo? <br />Input Btuh <br />Output Btuh <br />Ehrcienc . <br />1t(� <br />1'. &ZqJ CNcE <br />UUt1goo <br />(I 51q <br />Opp <br />41 V&i <br />Fan E ui nlent Schedule <br />Equip. <br />ID <br />Bra ' <br />Model No.' <br />CFM <br />gp' <br />HP/BHP <br />Flow Canrol <br />Location of Service <br />'II available. ] As tested accord,ng to Table 14.1A through 14.1 G. 111 required, x COP, HSPF, Combustion Efficiency, or AFUE. as <br />applicable. ° Flow control types variable air volume(VAV), constant volume (CV), or variable speed (VS) 1 <br />1 / 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.