Laserfiche WebLink
i <br />System Description <br />It Heating/Cooling <br />Constant vol? ♦ Air cooled? Packaged sys? <54,000 Rtuh <br />Sae Section 1421 for lull deacnphon <br />or Cooling Only: <br />Split system? Economizer included? or 1900 clm� <br />of Simple System qualifications. <br />g Heating Only: <br />0 <5000 cfm? ❑ <70% outside air? <br />Decision Flowchart Use this flowchart to determine It project qualifies for Simple System Option. If not, either the <br />Complex System or Systems Analysis Options must be used. <br />S TEAT 1 <br />or <br />Heating only <br /><dcoo fee <br />elm? <br />Reference <br />Section 1421 <br />No <br />No \or I <br />Econo <br />Included? <br />No <br />spin <br />Yee <br />Reference <br />Section 1423 •e4.000 stun <br />Reference <br />Section 1420 <br />No <br />Use Complex I <br />Reference <br />Systems section 14Jd <br />Complex Systems Refer to MECH-COMP Mechanical Complex Systems for assistance in determining which <br />�r Complex Systems requirements are applicable to this project. <br />