My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1304
>
EVERETT SCHOOL DISTRICT
>
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 7:26:51 AM
Creation date
12/12/2019 7:07:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1304
Tenant Name
EVERETT SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name Everett School District Transportation Facility Traffic Reviewer MGB <br /> Project Location 1304 80th St SW Dev Reviewer BS <br /> Project Description New School Bus Facility Planner JJ <br /> Received Date 5/1112006 Due Date 5118/2006 Review Date 571112006 File# SEPA#06012 <br /> Area Type EICBD EX SW Everett Remainder <br /> TRAFFIC STUDY REQUIRED <br /> Existing and Project Conditions and Phasing <br /> Define Existing Land Uses <br /> Define Project Land Uses <br /> Provide Existing PM Peak Tnp Generation <br /> Provide Project PM Peak Trip Generation <br /> Base PM Peak Trip Generation on traffic count of existing or similar site <br /> Provide project phasing,including the size and scheduled completion date of each phase <br /> Identify number of bedrooms per dwelling unit or dwelling units per structure <br /> X Site plan indicates parking for 112 40'buses, so this maximum capacity determines mitigation <br /> Traffic Mitigation Fee Estimate(NOTEā¢Fees may be recalculated at submittal If changes to project occur) <br /> X Proposed Development Traffic Fee Estimate(From Worksheet 1,attached) $123,738 <br /> X Existing Site Use Credit(From Worksheet 1,attached) - $82.178 <br /> X Estimate of Net Traffic Impact Fee(Including Existing Use Credit) = 541,560 <br /> No Traffic Mitigation Fee Estimated <br /> X Mitigation trip generation based on maximum bus capacity of 112 buses <br /> X Credit for bus traffic applied per GTC Traffic Report <br /> Construction Issues <br /> Provide construction phasing and timeline information <br /> Provide evidence that parking will be adequately provided for throughout project. <br /> Provide estimate of peak construction period traffic volumes <br /> Provide and gel approval for traffic control plan prior to any interuptions to the local street network <br /> Frontage Improvements <br /> X Provide Frontage ImprovementsX as needed from_ to <br /> Provide Roadway Improvements as needed from_ to <br /> Provide Pedestrian/Bicycle Improvements as needed from_ to <br /> Provide Alley Improvements as needed from to <br /> Provide ADA-approved wheel chair ramps at all crosswalks <br /> Provide Transit Shelter If project frontage includes transit stop <br /> City of Everett Staff Use Only ' / <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.