My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1304
>
EVERETT SCHOOL DISTRICT
>
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 7:26:51 AM
Creation date
12/12/2019 7:07:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1304
Tenant Name
EVERETT SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name Everett School District Transportation Facility Traffic Reviewer MGB <br /> Project Location 1304 Both St SW Dev Reviewer BS <br /> Project Description New School Bus Facility Planner JJ <br /> Received Dale 5111/2006 Due Date 5/19/2006 Review Data 5/111'2006 File# SEPA#06012 <br /> Area Type OCBD ❑X SW Everell Remainder <br /> TRAFFIC STUDY REQUIRED <br /> Site Access <br /> Check Si ht Distance(From Table 1,attached) DAt Intersections ❑Al Driveways <br /> Residential Development-Vertical Clearance from 30"to 60"above pavement 10'from Back of Curb <br /> Commercial Development-Vertical Clearance from 30"to 84"above pavement 15'from Back of Curb <br /> Right In I Right Out Tum Restriction at-- E]Condition of Permit Possible in Future <br /> Access point requires traffic control device Stop Sign Yield Sin Si nal Median/Island <br /> All roadways and driveways must meet City of Everett Design Standards <br /> Access point is public roadway,use City of Everett standard intersections <br /> Access point is private roadway,use City of Everett standard driveway plans <br /> Check access point Spacing-Adjacent Spacing-Opposite E]Throal Depth Grade <br /> All access points must be paved <br /> Reduce potential conflict points Access Points Street Intersections Driveway Cul <br /> Access point requires realignment <br /> Access points require consolidation <br /> Shared access with adjacent property recored <br /> Provide pedestrian access to UCily Sidewalks All Building Doorways <br /> Pedestrian facilities must be separated from vehicular traffic <br /> Potential emergency vehicle access issues-Review with Fi-e Marshall <br /> Site Circulation and Parking Issues <br /> Provide project location map,including adjacent driveways,local and arterial intersections <br /> Provide detailed site plan,Including circulation and parking details <br /> Reduce potential internal circulation conflicts <br /> Provide at least_Total Parking Spaces <br /> Provide at least_Visitor Parking Space <br /> Provide parking analysis indicating total estimated parking demand for project <br /> Parking layout must be consistent with City of Everett Standards <br /> All parking areas should be paved <br /> Pedestrian route should be between parking rows and separated from vehicle drive surface <br /> Provide commercial vehicle tum-around space/turning radius <br /> Provide freight vehicle tum-around space/turning radius <br /> Is freight loading/unloading zone required <br /> Check dumpster locations with disposal company <br /> City of Everett Staff Use Only <br /> x.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.