My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
>
Address Records
>
80TH ST SW
>
1304
>
EVERETT SCHOOL DISTRICT
>
1304 80TH ST SW EVERETT SCHOOL DISTRICT 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 7:26:51 AM
Creation date
12/12/2019 7:07:29 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1304
Tenant Name
EVERETT SCHOOL DISTRICT
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagc I ofd <br /> Benyam Stephanos <br /> From: Michael Brick <br /> Sent: Wednesday, February 14, 2007 2:43 PM <br /> To: 'Edward Koltonowski'; 'Camie Anderson' <br /> Cc: Dongho Chang; John Jimerson; Benyam Stephanos; Kirk Brooks, Ginny Boersema <br /> Subject: REEverett School District Transportation Facility Traffic Mitigation Fee <br /> Edward, <br /> Based on my our correspondence on the school district transportation facility trip gener n, a ity will revise <br /> the traffic mitigation fee assessed for this project. The new traffic mitigation fee Is$27,162. <br /> This revision addresses the custom trip generation developed by GTC (accepted as reported in the GTC traffic <br /> report submitted In support of this project)and the existing site use credit(revised to use the City of Everett <br /> standard of 40% passby traffic for specialty retail rather than the 25%passby rate applied in the GTC analysis). <br /> If you have any further questions regarding this determination, feel free to contact me. <br /> Michael Brick, P.E. <br /> Associate Engineer <br /> City of Everett-Traffic Engineering <br /> 425.257-7790 <br /> From: Edward Koltonowskl [mailto:edwardk_gtc@earthlink.net] <br /> Sent: Wednesday, February 14, 2007 8:57 AM <br /> To: Michael Brick; 'Camie Anderson' <br /> Cc: Dongho Chang <br /> Subject: FW: Everett School District Transportation Facility <br /> Just wondering if you have you had a chance to review my comments on the school district mitigation yet? <br /> Michael <br /> Could you please review my response below. I would appreciate your comments <br /> From: Edward Koltonowski [mailto:edwardk_gtc@earthlink.net] <br /> Sent: Thursday, February 08, 2007 10:24 AM <br /> To: 'Camie Anderson' <br /> Cc: 'Matt Palmer; 'Laura Brent <br /> Subject: RE: Everett School District Transportation Facility <br /> Camie <br /> Their argument about non credit for the passby is reasonable and would adjust our mitigation fee by 3 trips <br /> ( $3,018). However the variable used for the original trip generation rate was buses not bus spaces, therefore the <br /> trip generation for the new location should use the same variable i.e. buses not bus spaces. The existing located <br /> had several open spaces as will the new facility because operationally that is how they work operationally 110 <br /> buses is all they can operate at the new site effectively just like at the existing site although there is 78 spaces <br /> 2/15/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.