My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reid Middleton Inc 12/12/2019
>
Contracts
>
6 Years Then Destroy
>
2022
>
Reid Middleton Inc 12/12/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:13:35 AM
Creation date
12/19/2019 11:12:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton Inc
Approval Date
12/12/2019
Council Approval Date
12/4/2019
End Date
12/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovations
Tracking Number
0002125
Total Compensation
$70,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Dean Shaughnessy <br /> City of Everett Parks and Community Service <br /> October 23,2019 <br /> File No.2042019.913.036 <br /> 6 <br /> 6. Assumptions <br /> (a) The existing concrete ramp and boat ramp piling will remain. The <br /> existing piling will be used to anchor the replacement float system. <br /> If upon observation the existing piling are recommended for <br /> replacement,the pile replacement design can be provided as <br /> additional services as requested by the City. <br /> (b) The pavement repair will not require any new storm drainage <br /> improvements. Design of storm drainage elements is excluded from <br /> this scope of services. The scope also excludes any NPDES,SWPP, <br /> and DOE NOI services. <br /> (c) The City will perform all work including preparation of bid <br /> documents for replacement of the existing light fixtures with new <br /> LED light fixtures. <br /> (d) The City will pay all permit fees. <br /> (e) A building permit or other construction level permits will not be <br /> required due to the maintenance nature of the project. If building <br /> permit level services are required,these can be done as additional <br /> services as requested by the City. <br /> (1) It is assumed that the City shall prepare the front end construction <br /> contract documents including all contract documents and Division 1 <br /> of the technical specifications for the project manual. Reid <br /> Middleton will provide the bid schedule for the project to <br /> incorporate into the front end of the project manual. The City shall <br /> provide all front end documentation including Division 0 and <br /> Division 1 specifications. <br /> (g) The City shall be responsible for administrating the bid process for <br /> the project including advertising the project, distributing bid <br /> documents,bid opening, and other bid administration services. <br /> (h) The City shall lead the overall construction administration services <br /> and Reid Middleton will provide assistance. <br /> (i) A preapplication meeting and site meetings with the regulators will <br /> not be required for the project and no modification of permit <br /> drawings and submitted information will be required. It is also <br /> Reid' iddleto <br />
The URL can be used to link to this page
Your browser does not support the video tag.