My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reid Middleton Inc 12/12/2019
>
Contracts
>
6 Years Then Destroy
>
2022
>
Reid Middleton Inc 12/12/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 11:13:35 AM
Creation date
12/19/2019 11:12:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton Inc
Approval Date
12/12/2019
Council Approval Date
12/4/2019
End Date
12/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovations
Tracking Number
0002125
Total Compensation
$70,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Dean Shaughnessy <br /> City of Everett Parks and Community Service <br /> October 23,2019 <br /> File No.2042019.913.036 <br /> 5 <br /> (b) This scope includes 8 hours of Reid Middleton time to answer <br /> technical questions from DNR. <br /> (c) A surveyed DNR Lease Exhibit for the portion of the boat ramp on <br /> DNR property is excluded from this scope of services but can be <br /> done as additional services as requested by the City. <br /> 4. Bid Phase Services <br /> (a) Answer technical questions during the bid process and prepare up to <br /> two addendums to address bidder questions. <br /> (b) It is assumed that due to the relatively straightforward maintenance <br /> elements of the project that a prebid meeting will not be held. <br /> 5. Construction Phase Services <br /> (a) Attend a preconstruction meeting at the project site. <br /> (b) Review technical submittals including the float shop drawings and <br /> material submittals. <br /> (c) Respond to Requests for Information. <br /> (d) Perform one site visit to the location of float manufacturing to <br /> observe the fabrication of the float system. This scope is based on a <br /> fabrication location in Western Washington. <br /> (e) Perform three site observations during construction, including one <br /> site visit during float and approach wedge installation and two <br /> during the parking lot repairs and restriping. <br /> (f) Perform a punchlist walkthrough of the site. <br /> (g) Attend telephone coordination calls as requested. <br /> (h) This scope excludes attendance at weekly onsite construction <br /> meetings. <br /> Reid iddleto <br />
The URL can be used to link to this page
Your browser does not support the video tag.