My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
Geotech Report
>
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:03:57 PM
Creation date
12/26/2019 8:33:55 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> � tiuil n;iil; i�pi�alh cun;i,i ol'::6 tu �'I� thrc:idc�l st�cl bur; f'=� t�� I-' : inch di;imetcr). Ihc stccl bur, :uc <br /> placed in a- tu 13-inch-di�inet�r holes drilled at �n�les t��pic:ilh' rum�ing �ium 10 to �� degrces belo�c <br /> I horizontal. Centralizcrs are used [o cent�r[he steel b:irs in the holes. Once thc steel bars are installed. !hc <br /> { hules are grouted usinu cement �rout or concrete. Post ��rout tubes can be installed widi the steel bars to <br /> incrcase [he bond strength bch�cen tlic erout .md die soil. Post �routin�� consists ol'injectcd erout under <br /> � high pressurc throueh holes plattd in the post�rout tube ane to two d:rvs a�ier ini[ial grout placer.�ent. <br /> Thc soils t}�picall�� are rcquir:d ro have an adequate standup time ([o allo�c placemen[ of tlte steel �cire <br /> � nxsh ❑nd/or reinforein!_ burs to be installed and the shoterete to be pl;rced). Soils ��'hich ha��c shurt <br /> standup timcs arc problcmatic (o;soil nailinc:md may rcquire dtc usc of vertical cicmcnu. <br /> Prclimin:uti• Ucsign Rccommeud:Uions. �1'e recommend [hc follo���ing for prdiminan dc,iui purp�,:�'>: <br /> � • A soil nail erid pnttern ol about 6 feet by 6 �cet. <br /> . A soil n�iil Icngd� ot thrcoquarters o(the wall hei!,ht (but not I�ss than 10 fceQ. inclined n[ about <br /> � I� to 20 dc��rccs from dic I�orimnml. <br /> � • �\ preliminar� allowahlc ,idlicsiun �aluc of I ksf Ibr till soils, 2 ksf fbr �,lacial tilL and I.� ksf I��r <br /> thc advance ouhva;h and \1'hidbcy I'ornta[ion (utilizing a 6 to 1? inch di.mictcr nail). <br /> � . Strips o( draina��e material installed behind du shoterete to relieve hcdro;tatic pressur�<. <br /> I �\ddilional Jrainagc provisions m.iy be necess�ry should signiticant eround«atcr be encountcrc�l <br /> during�hc cxc;��:uion. <br /> � . It m;��� bc ncccssar�� ro install ��crtiral clumcnts ���ithin dic upper portion of thc soil nail �vall in <br /> ' ordcr to impro�c facc stabilih �cithin thc �ill soils or to act a, a c;mtilc�cr «all w mcct nail <br /> cicarancc requircm�nts where buried utilitics are present. Vertical elements typically cuiuist o( <br /> � vcrtical stecl bars or small bcams pl,�ced in drilled holes lucat�d alon� the ��'all �li��nment and <br /> bacl:filled with Ican concrete. l�he s'pacing of��ertical elemen;s typieally r;mces from 3 to d feet <br /> on c�nter. "fhe necd fin �crtic:il cicments shoulJ bc further evaluated during the desi�=n of the soil <br /> inail wall, if scl�cted. <br /> fhc �ill ;u thc sitc and ihe fill associated ��ith utilities locatcd bchind thc ��alls ��ill uffect the soil nail <br /> ) dcsign. 'I��pically, the soil n:iil sp:uing is tighter or the suil nails are lun�,er, or both. ���here �ill or luoser <br /> '1 nati�-e soils are present comp;u'ed to �vhere stiff to hard silt and clay ur dense to vcry dense sanJ and <br /> er;�ccl soils arc present. <br /> 1 Difficulties nssuciated �cith Gice stability and st.utdup time nury bc e�perienceJ durim_ consvuction in thc <br /> ;it� suils. Tlic lill soils were observcd tu bc loose to medium dense and as result, may have shorter sr.md <br /> I up timc. Cleaner sand and eracel soils ur suils IocateJ in areas �vidi perched �_ruundwater may also <br /> exhibit shorter ,tandup time,. Sp:illing anJ raveling uf the cut face may occur at these locatiuns durin_ <br /> soil nvil ��:�II instullatiun Constructiun �eclutiques used to miti�_ate spallin, and r.rvalinc include: <br /> � . I�lush co:iting the cut face «'ith 3 to a inchcs of �homrete immediatel}� after the cut face is <br /> � e�caeated ro final line and Ute drainaee m;uerial is iiutc�lled. This qpically provides enuu�=h <br /> ir,indup time tu ;�Iluw tix the in;tallatiun of the rcinturcin� steel and tinal shotcrcte. <br /> � I:xr,ic;uing in hall�hcicht (�- to 3-luut) li�is, �uth�r than tiill heieht (G-foo[) li(is. <br /> . <br /> I <br /> . I:�cav.um�, Ica�inc a I Ii:I V �;�rth berm in Gont of the walL The soil nails �re insutlled by <br /> drillina throuah thc soil bu'm. The soil berm is then removed to alluw for installution ot die <br /> �, draina�c nuueriol m�d reinfortine steel and shotcrom. <br /> . Shurtenine the lengdi of��:ill drilled :nd shutcrc�eJ usim� a st.r,gered ezcavatiun approach. <br /> I <br /> � P11{C�y GEOENGINEEflS� <br /> cilrAir l�l'i�-�iu��ui <br /> � ,Iw;u,l1�9. :pUG <br />
The URL can be used to link to this page
Your browser does not support the video tag.