My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
Geotech Report
>
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:03:57 PM
Creation date
12/26/2019 8:33:55 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � • In.tallin�� clu,cl�� ,p:�ecd certict�l wil nail, ur;m:ili >teel beams' (vertical elements) alum� [lic �cull <br /> ali�mncnt to minimize spallin,or rav�lin�s. <br /> I Contractors expericnced in the soil nailing me[hod shuulJ be able [o mitieate si_ni�icant spalline and <br /> r.rvcline cunditiuns. Contractors should also be prepm'ed tu use techniques to address preblcros that occur <br /> Iduc to cavine soils. The contractor should be made responsible for the safety of die shorine s�stem. <br /> Suil N;iil 1Vall Perfurm:�nce. A soil nail �vall is a passive shorine systcm ihat requires dcflection; I��r <br /> i lond to be applied to the ,oil nails. AVe recommend that Ihe soil nail be desiened such that acer;i�e ���ull <br /> � detlections bc limitcd to I inch and erowid surface setdements behind the wall be les� d;an abuut 1 inch. <br /> The deilections and scttlemcnts arc usuall} highest a[ Ihe excavatiun face and decre.ise to neeligiblc <br /> � amounts beyond a distance bchind the ��:ill eyunl to the escavation hcie�u. �Y:ill de�lcctions c;m b� <br /> reduccd by post-tensioning d�e upper ro���(s) of soil nnils. Localized deFlcctions ma}� cxceed the :iho�c <br /> cs[imates- nnd m�iy rcflect locul variations in soil conditions (such us around abundoned utilitics) ur m.:}� <br /> � be die result of thc �vorkmanship used to construct dre �vall. <br /> i <br /> � In addition to die above cstimulcd movement durine con:truc[ion ot thr wulL pennanent defonnatiun ��( <br /> the soil nail wall m;iy be c�perienced alier :m earthquake. Permanent deform;rtion o(the soil nail ��:ill <br /> � ���Ilowing a scismic cven[ �cill depend on the specitic desi¢n of the «:ill and is anticipated ro be minor <br /> � (Icss than about 1 inch). Pcnnancnt dcl'ormation of thc shoring systcm cun bc rcduced by stil�tim� thc <br /> ,��stcm (adding ndditional ur lonecr nails, post-tcnsioning the n;iils). <br /> � \lunitoring oCthc shoring systcm ,hould b� c�,mplctcd ;�: �I�,cril�c�l in :Appcu�li.� C. Cirowi� :An.:h�,r L��:i�1 <br /> I csis anJ Shoring Monitoring Program. <br /> � Drain:i�;e. n suitable drain;ige s�stem ;h�,ulJ bc insi;illcil to prc��cnt the buildup �f h��irostatic <br /> croundwater pressures behind thc suil nail �calls. Draina,� bchind suii n;iil ��alls t�picalh cuu,uu of <br /> � prefabricated geocumpusite driin;ige strips. such us �IiraDrainT�•'. installed ver[ic.�lly bcdveen d�e soil <br /> Inails. The draina_c strips are qpic;ilh a mininuun of IG inch�s �cide and e>:tend [hc entire heieht of the <br /> �vall. llori'r.ontal drainage suips may al,u bc used in areas �ehere perched !_round�vater is obsened. at <br /> � cold joints in permanent top-du�vn basement wall cunstruction, or for uUtcr re.�son;. A1�e rccnmmend thx[ <br /> � �Ir;�inacc strips be con:ieetcd to .i tightline pipe installed alonc the base uf the �call ;uid routed to ,i ;uii,�blr <br /> di;diarge point as described in the "[3clow Grade �Valls" section of this report. <br /> � Suil Y:�il �1'all Cunlr:ict. T�picall}' the bid on the sho[crete wall is bascd on an usswncd shutcrcte ��all <br /> thickncss. Spulling und ravcling of thc cut facc durim� cunsn�uc[ion cencr:ilh� result in suil nail «nll <br /> I euntractor chancc ordcrs. Accurdingh, «'c reconunend that the lulla��in, items be cunsidcred in order to <br /> reducc th� cust imp;ut of changc ordcrs and ta limit thr owncr s liabilit�' «ith rceard [o change ordcrs. <br /> The contr�ct should include unit prices lor shotcrete ovcrbreak (cubic yards) and �lashcoatin� <br /> (;yuare-loot ol wall tacc). "l�he unit prices shuuld incluJe all costs assuciated �tiith materials. placcment <br /> I anJ labor. \Vc recommend diat Gcu6ngineers revicw the contract on behalf of the o�vner to �ce that the <br /> risk ;ind liabili�y of putcntial chan�se orders are :iddressed ;�pprupriatelv. <br /> Soldier Pile and Tieback Walls <br /> i <br /> Suldier pile and tieback wulls nuiy be considered to retain the e�c:tvatiun or for dircct underpinning <br /> ;uppor� along the wes[ and suuth shoring wall udjucent to die �IOD and esisting hospi[al L•uilding. <br /> SolJier pile �valls consist of stcel bcams that are grouted into drilled venical liules located ;ilom� the w:�ll <br /> ;ilignmcnt, npicallv 8 Feet un center. Pollowin, esca�'a�iun to spccitied elevations, tiebacks are installyd. <br /> i <br /> � <br /> � Pa,�e' 9 GEOENGINEENS� <br /> � . .�.\,� IlI'�8-qqJ.dO <br /> c, <br /> ( .�lu.iur I':. :�rdn <br />
The URL can be used to link to this page
Your browser does not support the video tag.