My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
Geotech Report
>
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:03:57 PM
Creation date
12/26/2019 8:33:55 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> �, <br /> � r)nce thc tici,ack; urc in�uillcd. Ihc pulluui c;ipacit}� u(ruch ticb;ick i; tr,tcd ;md thr ticback i� lucl.��6uf�f <br /> to the suldier pilc at or near ihc de�i tn tieback loud. "I�icbucl:; ty�ic:ilh cun�ist of stecl ;tr:md, or bar, <br /> that are installcd into pre-drilled holcs and then cither tremie or pressure erouted. "limber la�_gim, is <br /> i typically installed b�hind the ilanees of the stccl beams to retain the suil loc,rted bet�cecn the soldier pilrs. <br /> Geotechnic�l desi�sn recommendations for e;ich of these eomponents of the soldier pile �nd tiebuck �c:ill <br /> s��stcm arc presented in thc follo���ing sections. <br /> I tiuldier Piles. Nc recommend that soldier pile ��:tlls be dcsicned using [hc eanh press'urc dia_rams <br /> � presen�cd in Pi�urcs 7 ,md S. 'I�he eartlt pressures prosrnted in Pieurc 7 arc for cantilecer walls ���ith <br /> � partial shorim, and sloping bucklill. Pi�,ure S prescnu rccommen��ed :ipp:ucnt earth pressure; lor <br /> full-hcigh[ soldi�r pile wnlls wilh ticbacks. fhc ;ipparcnt c;irth pre;,ure� in I i�we S arc c�pre..cd ;u an <br /> em�elope of the load anJ do not requirc lo;�d factors. <br /> � �I�he ear[h pressures presented in I�igurc 8 includc ihc lu;idin_ fr��m tra(iic surch;�r���. 1��c anticipate tlu �� <br /> partial shorin!s alt�rn;uivc dcpictcd on I�igurc i m:il' bc cconomic;il lur thc c;ut ��;ill uf thc ear:igc �vhiclt is <br /> � off.;et from Oaks Street (if soil nailing is not utiiized). Olher surcharge loacls, such us cranes, construction <br /> � cquipmcnt. or construction staging arc:is. should bc considcrcd b� thc shoring dcsi,,ner on a casc-by-casc <br /> basis. Pigure 9 presents resultine Interal pres,ures from poin[. line, and uniform loads. Seismic pressures <br /> � arc not i�idudcd in Pigures 7 and 3 bccaiisc thc shoring walls will bc tcinporury. <br /> \V'�• recommcnJ that thc embedded purtion ol the soldicr pilcs be tll Icast 2 feet in diametcr and e�[end a <br /> mininwm distancc of 10 �cct bclo�� thc b.isc of thc e�cavation to resist "kick-out.., l hc asial capatit� of <br /> � thc soldicr piles must resist the do�cnw;u'd component of the anchor luads and other ��erticul loads. :�s <br /> � appropriate. �1'c recommend wing an allo�cable end-bearing value of d0 ksf for piles suppo�ticJ un the <br /> J ��cry dense nati�c soils. "I'hc allo��able end bcaring �aluc should be appli�d to tlie base ama o�the drilkd <br /> holc into ��liich Ihc soldi�r pilc is gruutcd. This �aluc incluJcs a ��l'lOf 0� S:t�in of abuut '_.�. If <br /> nccessnry, an allo«�tible pile skin f�riction oF I S ks�ma}' bc us�d en thc embedded portion of the soldicr <br /> piles tu resist dic certical loads. <br /> 1 <br /> iLagging. \1'c recumm�nd that thc tcmporar< timber la!_gin� thickncss (rouehcut) be sized using the tablc <br /> bclo�v as a function ul suldicr pilc clear span and escavatiun depth. T hc la��ein!! thickncsses presen[ed in <br /> f the follu�ving tnblc arc based un procedures outlincd in the Fedcral Fliglt��;iy Administr;ition's <br /> i Gcutcchnical I:ncineerin^ Circular \'o. 3 and �n e.cpu'ience Gom simil:ir es�acations in do��n[own <br /> Sc;udc (scc Grant ct. al, 195-!). <br /> � P 99 9 ( g ) or Gear Spans of: <br /> Df��) 5 feet Recom6 feeded I� '7 feei icknless r8ofee1cut f . �-9 feet � 10 feet�� � <br /> I0 co 25 2 inches 3 inches I 3 inches I 3 inches I�� 4 inches I 4 inches <br /> , 25 to 100 3 inches � 3 inches � 3 inches � 4 inches 4 inches I 5 inches <br /> f I hc �pxc bchinJ thc la�s��ine should be tilled widt soil ur permeable sand slurry as soon a� practical. <br /> � Placcmen[ o( Utis matcrial ��ill help mduce the risk o( coids dc�'�lopim� beLind the ��all and resultant <br /> dam.�ge tu existing improcements' lor,itcd behind the ��';ill. The �corkmanship ,issocia[ed with luegin'� <br /> ! in,tallalion is impor�;mt for m:iintaining the inteerit} ol thc esca�'ation. Lae�im_ should be installed <br /> ; prumptly after esarvation. especiall�� in areas �chere perched :=roundwater is present or �chere clean sand <br /> and �sr.iczl suils .u� present and ca�ine �oils conditions arc likely. <br /> i <br /> i '1'icbacl:s. Tieback ;mchors can be useJ Ibr �vall heighu ��here cantile�er soldier pile �valls are not cost <br /> e(fcctive. Cinback :u�chors shuuld cztcnJ Lu cnough hchind the �vall to develop anchor;ige be}onJ thc <br /> i <br /> nu-load" zone (defincd on Pigure S) �.ind ���ithin a �tuble soil m�ss. �Th� anchors should be inclined <br /> � <br /> � , .,, Ab lll'i.S'-+10�-i�n� Png� 10 GEOENGINEERS� <br /> � �i:iqusT l8. :011l, <br />
The URL can be used to link to this page
Your browser does not support the video tag.