Laserfiche WebLink
1 • <br /> 2 CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> DATE: Sept. 19,2013 ADDRESS: PO Box 358 <br /> CONTRACTOR: Shoreline Construction CITY/STATE: Woodinville WA 98072 <br /> PROJECT TITLE: Lift Station 24 Force Main(Silver Way Seg) WORK ORDER NO. UP 3534 <br /> DATE WORK COMPLETE: August 2, 2013 FINAL AMOUNT: $154,957.65 <br /> (Exclusive of State Sales Tax) <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett, that the same or any part thereof has not been paid, and <br /> that I am authorized to sign for the claimant; that I have not rented or purchased any equipment or materials <br /> from any employee of the City; I further certify that the attached final estimate is a true and correct statement <br /> showing all the monies due me from the City of Everett under this contract; that I have carefully examined said <br /> final estimate and understand the same and that I hereby release the City of Everett from any and all claims of <br /> whatsoever nature which I may have, arising out of the performance of said contract, which are not set forth in <br /> said estimate. . ` / <br /> et= r TO ' TITLE <br /> Shoreli 'e Construction <br /> Subscri d and sw to before me this .V•40 day of 5�L -rn bt , 2013 �KALO0 44 <br /> _ If j1J2--,,A ec-2._ <br /> Notar�Public U " . _�` u= j <br /> f.; N; _ <br /> in and for the State of Washington, residing at _i-_c , Y� /-5-k-- .".% .Os ‘o 2 <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final estimate to be <br /> based upon actual measurements and to • <br /> be true and correct. APPROVED Date: . _if <br /> X � X 4tow <br /> /LIW <br /> Construction Manager Public :"'s Director • <br /> Tom Fuchs Dave Davis <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 6/2012 62 <br />