Laserfiche WebLink
12 <br /> CERTIFICATE OF COMPLETION <br /> Project: Lift Station 24 Force Main(Silver Way Segment) <br /> Contractor: Shoreline Construction <br /> Work Order No. UP 3534 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project,within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> Public o"s Director b:to <br /> Dave Davis <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Ray Stephanson <br /> Attest: <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> Jim Iles, City Attorney <br /> Date <br /> 63 <br />