My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/12/24 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/12/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 11:51:30 AM
Creation date
1/2/2020 11:49:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> SCOPE OF WORK <br /> City of Everett <br /> Evergreen.Way Stormwater Quality Retrofits <br /> PHASE 01 MADISON STREET AT EVERGREEN WAY INTERSECTION WATER <br /> QUALITY ANALYSIS AND RETROFIT DESIGN <br /> Task 1 Background and Existing Data <br /> • <br /> Objective: Secure existing data related to As-Builts, Survey, GIS,Right-of-Way,Utilities,Flooding <br /> Incidents,History,City Design&Controls Standards,etc. <br /> Activities: The following activities are associated with this task: <br /> • Prepare base map using City GIS,and identify additional information needed such as <br /> • survey, right-of-way, easements,project limits, geotechnical information, permits & <br /> franchise requirements,design standard and public interaction. <br /> Deliverables: The following deliverables will be prepared: <br /> • Project Goals and Objectives <br /> • Base Map <br /> • Design Criteria <br /> Assumptions: The following assumptions apply to this task: <br /> • The City will have significant information from current records to develop base maps <br /> and define existing conditions. A gap analysis will identify what additional <br /> information is needed to prepare base maps and basis of design outline. <br /> Task 2 Survey for Base Map <br /> Objective: Conduct field survey for intersection improvements based on available GIS and as-builts. <br /> Activities: The following activities are associated with this task; <br /> • Conduct field survey including right-of-way; locate improvements not on as-builts or <br /> city records,obtain inverts,and other relevant topographic data. <br /> Deliverables: The following deliverables will be prepared: <br /> • Survey data if required <br /> Assumptions: The following assumptions apply to this task: <br /> • Survey based on existing City controls. <br /> City of Everett <br /> mwater ali Retro is Eve 236-1844-821 <br /> Sfor <br /> Qu ty f Evergreen Way 1 December 7,2013 <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.