My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/12/24 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/12/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 11:51:30 AM
Creation date
1/2/2020 11:49:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> Task 3 Geotechnical Investigation <br /> Objective: Review available geotechnical information and conduct field borings and analysis to <br /> • determine soilconditions for infiltration. <br /> Activities: The following activities are associated with this task: <br /> • Conduct up to six(6)borings to determine soil conditions. <br /> • Analyze soil types and infiltration rates. _ <br /> Deliverables: The following deliverables will be prepared: <br /> • Geotechnical/Soil Report <br /> Assumptions: The following assumptions apply to this task: <br /> • No`permits are heeded for eXpIoration.= <br /> Task 4 Right-of-Way&Permits <br /> Objective: Determine if additional right-of-way is required, if so, prepare legal description. <br /> Determine what permits will be required for construction and prepare applications as <br /> • needed. <br /> Activities: The following activities are associated with this task: <br /> ▪ Determine if additional right-of-way will be required to construct and maintain <br /> improvements: <br /> • <br /> • Prepare legal descriptions. <br /> • Develop permit applications and required supporting documentation.. _ <br /> Deliverables: The following deliyerables will be prepared: <br /> • Legal Descriptions <br /> • Permit Applications <br /> Assumptions: The following assumptions apply to this task: <br /> • City will acquire right-of-way. <br /> • City will file permit applications. <br /> • An EIS will not be required. <br /> Task 5 Basis of Design and Pre-Design Report <br /> Objective: To prepare and submit to the Department of Ecology a pre-design report. <br /> Activities: The following activities are associated with this task: <br /> City of Everett 236-1844-821 <br /> Stormwater Quality Retrofits Evergreen Way 2 December 7,2013 <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.