My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/12/24 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/12/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 11:51:30 AM
Creation date
1/2/2020 11:49:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> • Provide ongoing guidance to project team related to scope, schedule,budget,goals and <br /> constraints. <br /> • Closeout project. <br /> Deliverables: The following deliverables will be prepared: <br /> • Project Management Plan <br /> • • Monthly progress report and invoices. <br /> Assumptions: The following assumptions apply to this task: <br /> • Project duration does not exceed twelve months. <br /> PHASE 02 MADISON STREET AT EVERGREEN WAY FLOOD REDUCTION AND <br /> PROTECTION ANALYSIS AND DESIGN <br /> Task 1 Background and Incident History <br /> Objective: Determine history of flooding, the area's contribution to runoff, and possible cause <br /> including rainfall and runoff. <br /> Activities: The following activities are associated with this task: <br /> • Prepare tech memo on contribution area, flooding incident reports, maintenance <br /> records, staff interviews and service request records, field observations and other <br /> information that defines the flooding event(s)and possible causes. <br /> Deliverables: The following deliverables will be prepared: <br /> • Tech Memo and associated support information summarizing historical flooding <br /> events <br /> Assumptions: The following assumptions apply to this task: <br /> • No aerial mapping or surveying is needed. <br /> Task 2 Analysis of Ways to Reduce Flooding Incidents and Protect Impacted <br /> Properties <br /> Objective: Verify recommendations on corrective actions for reducing flooding incidents that impact <br /> properties as set forth in the summary sheet PC1-1. <br /> Activities: The following activities are associated with this task: <br /> • Review volume and velocity to compare against system capacity and constraints <br /> including open channel conveyance system and structures in the basin using an <br /> applicable computer model. <br /> Deliverables: The following deliverables will be prepared: <br /> • A recommendation on corrective actionincluding scope and costs as well as impacts <br /> on private property in a project summary sheet format. <br /> City of Everett <br /> Stormwater Quality Retrofits Evergreen Way 5 236-1844-821 <br /> December 7,2013 <br /> 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.