Laserfiche WebLink
Project: Everett Downtown Streetscape Improvement <br /> Change Order No.2 <br /> Change Order Effective Date: November 4, 2019 <br /> CITY <br /> Attest: Approved As to Form: <br /> Office of the City Attorney <br /> APPROVED AS TO FORM <br /> David C.Hall,City Attorney <br /> ayor City Clerk, / City Attorney <br /> Date: 12 C Date: Date: /r 2 0, <7 <br /> Recommended By: <br /> Construction Project Engineer(if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> r)34(ek iLhiguirip,fir <br /> Date: //-7-I? Date: &7 ate: II 7-2447 D e: II- 7 Z°i/( <br /> CONTRACTOR <br /> By �2- �.� Date: --/q <br /> Officer <br /> Exhibit A - Description of Changed Work <br /> This Change Order No. 2 adds two (2) new items to Schedule C and deletes one(1) existing bid item <br /> from Schedule C of the Contract as shown below. This Change Order No. 2 pertains only to the items <br /> added or deleted by this change order and does not include any costs borne by the City of Everett for <br /> not granting a variance to the noise ordinance. <br /> Added Items <br /> New Item#C-204-Equitable Adjustment for Differing Site Conditions and Unsuitable Soils on <br /> Rucker Avenue. Add new item#C-204 entitled, "Equitable Adjustment for Differing Site Conditions <br /> and Unsuitable Soils on Rucker Avenue" at the agreed to lump sum price of$376,822.56, which <br /> results in a Contract increase of$376,822.56. <br /> Page 3 of 4 <br />