Jansen Inc 12/21/2019 Change Order 2
>
Contracts
>
Capital Contract
>
Jansen Inc 12/21/2019 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 9:39:15 AM
Creation date
1/3/2020 9:39:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jansen Inc
Approval Date
12/21/2019
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Downtown Streetscape Improvement
Public Works WO Number
PW3553, PW3640, UP3648
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0001861
Total Compensation
$348,782.56
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Jansen Inc 6/10/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Everett Downtown Streetscape Improvement <br /> Change Order No.2 <br /> Change Order Effective Date: November 4, 2019 <br /> New Item# C-205—Install City of Everett Transit Shelter. Add new item#C-205 entitled, "Install <br /> City of Everett Transit Shelter"by adding this $10,000.00 force account item to the Contract to install <br /> a City of Everett provided transit bus shelter,resulting in a Contract increase of$10,000.00. <br /> Deleted Bid Item <br /> Bid Item# C-106—Transit Shelter. Delete existing bid item entitled, "Transit Shelter" at the <br /> Contract Unit Price of$38,040.00/Each,resulting in a Contract decrease of$38,040.00. <br /> JUSTIFICATION <br /> Bid Item# C-106—Transit Shelter. This existing bid item is being deleted because there aren't any <br /> bus shelter manufacturers that build one as shown in the project drawings and to custom build would <br /> be very expensive. The City of Everett Transit Department is providing an appropriate substitute bus <br /> transit shelter for the project which the contractor will install on Rucker at the location shown in the <br /> approved drawings. <br /> New Item# C-204—Equitable Adjustment for Differing Site Conditions and Unsuitable Soils on <br /> Rucker Avenue. While removing existing roadway pavement on Rucker Avenue, the contractor <br /> discovered that there were multiple electrical conduits in the intersections on Hewitt Avenue, <br /> specifically at California and Wall Street,that were too high for the new roadway elevation, and they <br /> needed to be either removed or lowered. Also encountered in this section of Rucker-Hewitt Avenue to <br /> Wall Street, were unsuitable soils with organics, that needed to be removed,hauled off, and replaced <br /> with suitable engineered fill and geogrid for stability. This new item is being added to account for <br /> costs to do this extra work and for costs associated with the delay caused by these differing site <br /> conditions. <br /> New Item# C-205—Install City of Everett Transit Shelter. This new item is being added to <br /> account for costs to install a City of Everett provided bus transit shelter on northbound Rucker Avenue, <br /> at the location shown on the approved drawings. <br /> Cost of Change Order No. 2 <br /> Schedule C Costs: $348,782.56 <br /> Total Cost of Change Order No. 2: $348,782.56 <br /> Contract Time <br /> There are fourteen (14) days added to the Contract, as a result of Change Order No. 2. <br /> Page 4 of 4 <br />