Project: Everett Downtown Streetscape Improvement <br /> Change Order No.2 <br /> Change Order Effective Date: November 4, 2019 <br /> New Item# C-205—Install City of Everett Transit Shelter. Add new item#C-205 entitled, "Install <br /> City of Everett Transit Shelter"by adding this $10,000.00 force account item to the Contract to install <br /> a City of Everett provided transit bus shelter,resulting in a Contract increase of$10,000.00. <br /> Deleted Bid Item <br /> Bid Item# C-106—Transit Shelter. Delete existing bid item entitled, "Transit Shelter" at the <br /> Contract Unit Price of$38,040.00/Each,resulting in a Contract decrease of$38,040.00. <br /> JUSTIFICATION <br /> Bid Item# C-106—Transit Shelter. This existing bid item is being deleted because there aren't any <br /> bus shelter manufacturers that build one as shown in the project drawings and to custom build would <br /> be very expensive. The City of Everett Transit Department is providing an appropriate substitute bus <br /> transit shelter for the project which the contractor will install on Rucker at the location shown in the <br /> approved drawings. <br /> New Item# C-204—Equitable Adjustment for Differing Site Conditions and Unsuitable Soils on <br /> Rucker Avenue. While removing existing roadway pavement on Rucker Avenue, the contractor <br /> discovered that there were multiple electrical conduits in the intersections on Hewitt Avenue, <br /> specifically at California and Wall Street,that were too high for the new roadway elevation, and they <br /> needed to be either removed or lowered. Also encountered in this section of Rucker-Hewitt Avenue to <br /> Wall Street, were unsuitable soils with organics, that needed to be removed,hauled off, and replaced <br /> with suitable engineered fill and geogrid for stability. This new item is being added to account for <br /> costs to do this extra work and for costs associated with the delay caused by these differing site <br /> conditions. <br /> New Item# C-205—Install City of Everett Transit Shelter. This new item is being added to <br /> account for costs to install a City of Everett provided bus transit shelter on northbound Rucker Avenue, <br /> at the location shown on the approved drawings. <br /> Cost of Change Order No. 2 <br /> Schedule C Costs: $348,782.56 <br /> Total Cost of Change Order No. 2: $348,782.56 <br /> Contract Time <br /> There are fourteen (14) days added to the Contract, as a result of Change Order No. 2. <br /> Page 4 of 4 <br />