My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
>
Contracts
>
Capital Contract
>
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 9:54:31 AM
Creation date
1/3/2020 9:54:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc (ICI)
Approval Date
12/2/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
18
Tracking Number
0000801
Total Compensation
$23,500.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> August 2nd, 2019 Serial Letter 051 <br /> Ken Kettel,P.E.,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett, WA 98201 <br /> RE: Notice of Change: Heat Trace per RFI 290 Responses <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) provides this letter in accordance with Section 1-04 of the <br /> Standard Specifications to notify the City a change of condition. <br /> The response provided to RFI 290 dated July 24, 2019 but provided officially on July 29, 2019 <br /> provides details on a heat trace system for the sanitary sewer force main. Provisions for the <br /> electrical connection were been made but the remainder of the system is not included in the <br /> project documents. Interwest interprets this RFI response to add work to the Contract and <br /> requests a Change Order to address this addition. Interwest has begun to investigate the cost <br /> implications of this addition and will forward those costs when they become known. If there is an <br /> particular timeframe in which you require that proposal be submitted by, please advise of that <br /> deadline with enough lead time to meet it. <br /> Please do not hesitate to call with any questions, comments, or concerns. <br /> Respectfully, <br /> INTERWEST CONSTRUCTION,INC. <br /> c.G t <br /> Izaak Fox, P.E. <br /> Project Manager <br /> Cc: Project File <br /> Enclosure: <br /> 609 N.Hill Blvd.I Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI121 OF <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.