Project: South Precinct Roof Replacement Project <br /> Change Order No. One <br /> Change Order Effective Date: Date of Mayor's Signature <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to,this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including,but <br /> not limited to, claims for equitable adjustment of time and compensation, delay,impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> ;tea <br /> CITY ., y <br /> Attest: Approved As to Form: <br /> Office of the City Attorney <br /> APPROVED AS TO FORM <br /> A J ', = _ . David C.Hall,City Attorney <br /> • .yor City Clerk City Attorney <br /> Date: 7 Date: 1213 e1)-0/1 Date: Z 3, /5 <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> 91�i* JJ1 .' 4.Y��• <br /> Date: Date: _�i _ Date: Date: <br /> ,lig 4 <br /> Page 2 of 3 <br />