Laserfiche WebLink
• <br /> Project: South Precinct Roof Replacement Project <br /> Change Order No. One <br /> Change Order Effective Date: Date of Mayor's Signature <br /> CONTRACTOR <br /> Olgitally signed by Michael Bistran <br /> DN C=US, <br /> E=m bistran@snyder-builds corn, <br /> Michael Bistran O=Snyder Roofing of Washington, <br /> OU=Project Manager,CN=Michael <br /> eistran <br /> By Date:2019.12.1707:20:25-08'00' Date: <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> 1. Asbestos and lead abatement $24,154.00 <br /> 2. Walk pad upgrade to Cross-grip $ 5,075.00 <br /> 3. Additional wood blocking and edge metal $ 6,644.00 <br /> 4. Removable curb cap flashing $ 401.00 <br /> 5. Lightning cable re-securement $ 686.00 <br /> TOTAL $36,960.00 <br /> Page 3 of 3 <br />