Laserfiche WebLink
3, Verizon Northwest has facilitfes near this location. However, any buildinp entrances must be <br /> coordinated at leasl 60 deys in advance. The cost of any relocation ot Verizon faciliNes that <br /> is required to construct the new apartments will be at the total expense of the developer. Any <br /> relocation will take 60 to 120 days. Please contact Mike Hupf, Engineer at(425)358�052 or <br /> Mike Bly, Engineer al(425)356-4034 ff you have any questions regarding this building <br /> entrance. <br /> 4. Verizon NoAhwest will provide service to the site. However, new telephone cable <br /> construction will be required in conjunction with the aite development. Verizon's engfneering <br /> will begin when they are notified ot your construction schedules and telephone requfrements. <br /> 5. It will be the developer's responsibility to provide a suitable combination of conduit and <br /> trenching and/or riser conduit to accommodate Verizon's nelwork communications ceble <br /> within the complex. Provided that an acceptable combination of conduit and/or trenching is <br /> incarporated into the project to accommodate Verizon's entrance cable, there will be no costs <br /> to the developer for Verizon's cable. <br /> 6. If a reaRangement of existing cables on premises or on the right-of-way is necessary, <br /> appropriate charges will be estimated and Verizon's Guaranty af Payment form will be <br /> forwarded to you for your signature. Prfor to commencement of Verizon's engineering (or <br /> such rearrangement, a deposit will be required. To insure timely telephone service, Verizon <br /> requests ninety (90) days lead time for engineering, procurement, and installation of cable <br /> and/or Verizon's equipment. <br /> Please contact Michael Hupf, Engineer, at (425)356-4052 or Mike Bly, Engineer at (425)358- <br /> 4034 should you require additional information. <br /> S.�FSiddp\WINWORD�iEPA�iepa05�045 Caecede CouA Finel.doc <br /> Y <br />