My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 8-02.5 Payment 194 <br /> I 8-04 CURBS, GUTTERS AND SPILLWAYS 194 <br /> 8-04.1 Description 194 <br /> 8-04.2 Materials 194 <br /> I 8-04.3 Construction Requirements 194 <br /> 8-04.4 Measurement 195 <br /> 8-04.5 Payment 195 <br /> I8-05 VACANT 195 <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 195 <br /> 8-06.1 Description 195 <br /> I8-06.2 Materials 195 <br /> 8-06.3 Construction Requirements 195 <br /> I 8-06.4 Measurement 196 <br /> 8-06.5 Payment 196 <br /> 8-13 MONUMENTCASES 196 <br /> I 8-13 SURVEY MONUMENTS AND CASES (******) 196 <br /> 8-13.1 Description 196 <br /> 8-13.2 Materials 196 <br /> 1 8-13.3 Construction Requirements 197 <br /> 8-13.4 Measurement 197 <br /> 8-13.5 Payment 197 <br /> I8-14 CEMENT CONCRETE SIDEWALKS 197 <br /> 8-14.2 Materials 197 <br /> 8-14.3 Construction Requirements 197 <br /> 8-14.4 Measurement 199 <br /> 8-14.5 Payment 199 <br /> I 8-22 PAVEMENT MARKING 199 <br /> 8-22.1 Description 199 <br /> 8-22.4 Measurement 199 <br /> 111 8-22.5 Payment 199 <br /> DIVISION 9 - MATERIALS 201 <br /> 1 9-03 AGGREGATES 201 <br /> 9-03.6 Vacant 201 <br /> 9-03.6 Aggregates for Asphalt Treated Base (ATB) 201 <br /> 1 9-03.22 Sand Backfill for Pipe Zone (******) 202 <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING 202 <br /> 9-14.1 Soils 202 <br /> I 9-14.2 Seed 205 <br /> 9-14.3 Fertilizer 205 <br /> 9-14.4 Mulch and Amendments 206 <br /> I9-14.6 Plant Materials 206 <br /> 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 206 <br /> I 9-23.2 Liquid Membrane-Forming Concrete Curing Compounds 206 <br /> Watermain Replacement"U" Table of Contents - October 1, 2019 <br /> WO No.-UP3698 SP -vii <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.