Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> WATERMAINS, AND CONDUITS 173 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 173 r <br /> 7-08.1 Description 173 <br /> 7-08.2 Materials 173 <br /> 7-08.3 Construction Requirements 173 <br /> 7-08.4 Measurement 175 <br /> 7-08.5 Payment 175 <br /> 7-09 WATERMAINS 175 <br /> 7-09.1 Description 175 <br /> 7-09.2 Materials 176 <br /> 7-09.3 Construction Requirements 176 <br /> 7-09.4 Measurement 181 <br /> 7-09.5 Payment 182 <br /> 7-12 VALVES FOR WATERMAINS 182 <br /> 7-12.1 Description 182 <br /> 7-12.2 Materials 182 <br /> 7-12.3 Construction Requirements 182 <br /> 7-12.4 Measurement 183 <br /> 7-12.5 Payment 183 <br /> 7-14 HYDRANTS 183 <br /> 7-14.1 Description 183 <br /> 111 <br /> 7-14.2 Materials 183 <br /> 7-14.3 Construction Requirements 183 <br /> 7-14.4 Measurement 184111 <br /> 7-14.5 Payment 184 <br /> 7-15 SERVICE CONNECTIONS 184 <br /> 7-15.1 Description 184 <br /> 7-15.2 Materials 185 <br /> 7-15.3 Construction Requirements 185 <br /> 7-15.4 Measurement 186 <br /> 7-15.5 Payment 186 <br /> DIVISION 8 - MISCELLANEOUS CONSTRUCTION 189 <br /> 11 <br /> 8-01 EROSION CONTROL 189 <br /> 8-01.1 Description 189 <br /> 8-01.3 Construction Requirements 189 <br /> 8-01.4 Measurement 191 <br /> 8-01.5 Payment 192 <br /> 8-02 ROADSIDE RESTORATION 192 <br /> 8-02.1 Description 192 <br /> 8-02.2 Materials 192 a <br /> 8-02.3 Construction Requirements 192 <br /> 8-02.4 Measurement 194 <br /> Watermain Replacement "U" Table of Contents - October 1, 2019 1 <br /> WO No.-UP3698 SP -vi <br /> I <br />