My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 The Contractor and the City recognize that the impact of overcharges to the City by the <br /> Contractor resulting from antitrust law violations by the Contractor's suppliers or <br /> Subcontractors adversely affects the City rather than the Contractor. Therefore, the <br /> Contractor agrees to assign to the City all claims for such overcharges. <br /> 1-08 PROSECUTION AND PROGRESS <br /> Supplement Section 1-08 by adding the following: <br /> 1-08.0 Preliminary Matters <br /> I1-08.0(1) Preconstruction Conference <br /> Prior to the Contractor beginning the Work, a preconstruction conference will be held <br /> between the Contractor, the Engineer and such other interested parties as may be <br /> I invited. The purpose of the preconstruction conference will be: <br /> 1. To review the initial progress schedule; <br /> 2. To establish a working understanding among the various parties associated or <br /> affected by the Work; <br /> 3. To establish and review, at a minimum, procedures for progress payment, <br /> notifications, approvals, and submittals; <br /> 4. To establish normal working hours for the Work; <br /> 5. To review safety standards and traffic control; and <br /> 6. To discuss such other related items as may be pertinent to the Work. <br /> The Contractor shall prepare and submit at the preconstruction meeting the following: <br /> 1. A Schedule of Values of all lump sum items; <br /> 2. A preliminary schedule of working drawing submittals; and <br /> 3. A list of material sources for approval if applicable. <br /> 1-08.0(2) Hours of Work <br /> Except in the case of emergency or unless otherwise required by 1-07.23(1) or otherwise <br /> noted and approved by the City within these Special Provisions„ the normal straight time <br /> working hours for the Contract shall be any consecutive 8-hour period between 7:00 <br /> a.m. and 6:00 p.m. of a working day with a maximum 1-hour lunch break and a 5-day <br /> work week. Should Contractor elect to work on a holiday or weekend, those normal <br /> working hours shall be from 9:00 a.m. to 6:00 p.m. The normal straight time 8-hour <br /> working period for the Contract shall be established at the preconstruction conference <br /> or prior to the Contractor commencing the Work. <br /> When night connecting to existing water mains and services are required, the City will <br /> obtain all necessary permissions and the normal hours of work shall be any consecutive <br /> 8-hour period between 6:00 p.m. and 7:00 a.m. Refer to 7-09.3(19)A regarding night or <br /> weekend connection work time requirements. <br /> If a Contractor is required to or desires to perform Work on holidays, weekends, or before <br /> 7:00 a.m. or after 10:00 p.m. on any weekday, the Contractor shall apply in writing to the <br /> Engineer for permission to work such times. Permission to work longer than an 8-hour <br /> period between 7:00 a.m. and 6:00 p.m. is not required. Such requests shall be <br /> submitted to the Engineer no later than noon on the working day prior to the day for <br /> which the Contractor is requesting permission to work, unless a noise variance will be <br /> required. In such case provide request a minimum of 30 days prior to performing the <br /> work in accordance with 1-07.1(1) NOISE. <br /> Permission to work Saturdays, Sundays, holidays or other than the agreed upon normal <br /> straight time working hours Monday through Friday may be given subject to certain other <br /> conditions set forth by the City or Engineer. These conditions may include, and not be <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—91 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.