My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> limited to; requiring the Contractor to reimburse the City for the costs in excess of <br /> straight-time costs for City employees and necessary assistants who worked during such <br /> times, on non-Federal aid projects. Assistants may include, and are not be limited to, <br /> survey crews; personnel from the City's material testing lab; inspectors; and other City <br /> employees when in the opinion of the Engineer, such work necessitates their presence. <br /> The work performed on Saturdays, Sundays, and holidays will be considered as working <br /> days with regards to the Contract Time; and considering multiple work shifts as multiple <br /> working days with respect to Contract Time even though the multiple shifts occur in a <br /> single 24-hour period. <br /> 1-08.0(3) Reimbursement for Overtime Work of City Employees and I <br /> Assistants <br /> Where the Contractor elects to work on a Saturday, Sunday, or holiday, or longer than <br /> an 8-hour work shift on a regular working day, as defined in the Standard Specifications, <br /> such work shall be considered as overtime work. On all such overtime work an inspector <br /> will be present, and a survey crew may be required at the discretion of the Engineer. If <br /> such work is the result of Contractor's inability to complete work or coordinate materials, <br /> equipment and labor in accordance with agreed schedule, then the City may deduct from <br /> amounts due or to become due to the Contractor for the costs in excess of the straight- <br /> time costs for employees and assistants of the City required to work overtime hours. <br /> The Contractor by these specifications does hereby authorize the Engineer to deduct <br /> such costs from the amount due or to become due to the Contractor. <br /> 1-08.1 Subcontracting I <br /> Delete the eighth paragraph in 1-08.1 and substitute the following: <br /> On all projects funded with City funds only, the Contractor shall certify to the actual <br /> amounts paid Disadvantaged, Minority, or Women's Business Enterprise firms that were <br /> used as subcontractors, lower tier subcontractors, manufacturers, regular dealers, or <br /> service providers on the Contract. This certification shall be submitted to the Engineer <br /> on WSDOT form 140-542 within 20 calendar days after physical completion of the <br /> Contract. <br /> Supplement 1-08.1 by adding the following: <br /> The Contract Documents shall apply to Subcontractors and suppliers as if each had <br /> signed the Contract with the City. Contractor shall include the provisions of these <br /> Contract Documents or a "flow down" clause in each contract with Subcontractors and <br /> suppliers. <br /> The City will not approve a Subcontractor that is also providing services to the City on <br /> the same project. <br /> No Subcontractor or lower tier subcontractor will be permitted to perform Work under the <br /> Contract until the following documents have been completed and submitted to the <br /> Engineer: <br /> 1. Request to Sublet Work (Form 421-012), and <br /> 2. Contractor and Subcontractor or Lower Tier Subcontractor Certification for <br /> Federal-aid Projects (Form 420-004). <br /> The Contractor's records pertaining to the requirements of this Special Provision shall <br /> be open to inspection or audit by representatives of the City during the life of the Contract <br /> and for a period of not less than three years after the date of acceptance of the Contract. <br /> The Contractor shall retain these records for that period. The Contractor shall also <br /> guarantee that these records of all Subcontractors and lower tier subcontractors shall <br /> be available and open to similar inspection or audit for the same time period. <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—92 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.