My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> of each statement, the Contractor shall file a written protest of any alleged I <br /> discrepancies in it. To be considered by the Engineer, the protest shall be in <br /> sufficient detail to enable the Engineer to ascertain the basis and amount of time <br /> disputed. By not filing such detailed protest in that period, the Contractor shall be <br /> deemed as having accepted the statement as correct. If the Contractor elects to <br /> work ten hours a day and four days a week (a 4-10 schedule) and the fifth day of <br /> the week in which a 4-10 shift is worked would ordinarily be charged as a working <br /> day then the fifth day of that week will be charged as a working day whether or not <br /> the Contractor works on that day. <br /> The Engineer will give the Contractor written notice of the Physical Completion Date <br /> for all Work the Contract requires. That date shall constitute the Physical <br /> Completion Date of the Contract, but shall not imply the City's acceptance of the <br /> Work or the Contract. <br /> The Engineer will give the Contractor written notice of the Completion Date of the <br /> Contract after all the Contractor's obligations under the Contract have been <br /> performed by the Contractor. The following events must occur before the <br /> Completion Date can be established: <br /> 1. The physical Work on the project must be complete; and <br /> 2. The Contractor shall furnish all documentation required by the Contract I <br /> and required by law, to allow the City to process final acceptance of the <br /> Contract. <br /> The following documents must be received by the Engineer prior to establishing a <br /> Completion Date: <br /> a. Certified payrolls. <br /> b. Material Acceptance Certification Documents. t <br /> c. Annual Report of Amounts Paid as MBE/WBE Participants. <br /> d. Final Contractor Voucher Certification. <br /> e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> and all Subcontractors. <br /> Supplement 1-08.5 by adding the following: <br /> 1-08.5(2) Substantial Completion <br /> When the Contractor considers the Work to be Substantially Complete and ready for its <br /> intended use, it shall give Notice to the City's Representative. The Notice shall include <br /> an itemized list of remaining incomplete Work. If the City's Representative determines <br /> the Work is not substantially complete, it will so notify the Contractor in writing, identifying <br /> the reasons for such a determination. If the City's Representative finds the Work <br /> substantially complete, it will meet with the Contractor to (1) prepare a Punch List of <br /> incomplete items of Work; (2) define the division of responsibility between City and <br /> Contractor with respect to security, operation, maintenance, heat, utilities, insurance, <br /> and warranties; and (3) describe other issues related to acceptance of the substantially <br /> completed Work. <br /> If the City's Representative is not an employee of the City, the City's Representative will <br /> write to the City upon reaching agreement with the Contractor, certifying that the Work <br /> is substantially complete, listing the items of incomplete Work, stating the date for <br /> completion of incomplete work, defining the division of responsibilities, and setting forth <br /> any other terms related to acceptance. In such event, the City will review the City's <br /> Representatives certification tha t the Work is substantially complete. If the City concurs, <br /> Watermain Replacement "U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—100 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.