My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> any rights by the City nor shall the City be estopped from any legal or equitable <br /> remedies that may be appropriate. <br /> Supplement 1-08.10 by adding the following: <br /> 1-08.10(6) Termination by Contractor after Suspension <br /> (******) <br /> If the Work has been wholly suspended pursuant to 1-08.6 SUSPENSION OF WORK <br /> for more than 90 calendar days as measured from the date of the Notice to suspend, <br /> then the Contractor may terminate this Contract by providing City with 14 calendar days' <br /> Notice that the Contractor shall deem the Contract to be terminated if the City does not <br /> provide Contractor with notice to resume Work within those 14 calendar days. Such <br /> termination shall be treated as a termination for the City's convenience pursuant to 1- <br /> 08.10(2) TERMINATION FOR PUBLIC CONVENIENCE. <br /> 1-08.10(7) Contractor Obligations upon Termination <br /> (******) <br /> On receipt of notice of termination, the Contractor shall immediately discontinue the <br /> Work but shall do such Extra Work as may be ordered by the City's Representative or <br /> City to safeguard the Work then completed and the materials and Equipment then <br /> delivered to the site of the Work and to leave the Work in a safe and useful condition. <br /> Payment for this Extra Work will be made in accordance with 1-09.4 EQUITABLE <br /> ADJUSTMENT. <br /> 1-08.10(8) Ownership of Materials upon Termination <br /> (******) <br /> As of the termination date, whether effected by the City or Contractor as provided herein, <br /> all the Contractors right, title, and interest in and to materials ordered by the Contractor <br /> prior to termination, whether or not they have been delivered to the site of Work, shall <br /> be vested in the City, and the Contractor shall, upon demand of the City, execute and <br /> l deliver to the City all requisite bills of sale, assignments, and other documents of transfer <br /> that may be necessary to give effect to the intention of the termination procedures set <br /> forth above. <br /> 1-08.10(9) Opportunity to Cure <br /> (******) <br /> If the Contractor has not already had an opportunity to cure the default or breach the <br /> City shall specify the default or breach and a reasonable period of time to allow the <br /> Contractor to cure the default or breach. The Notice of termination will state the time <br /> period in which cure is permitted and other conditions as the City, in its sole judgment, <br /> shall deem appropriate. If Contractor fails to remedy the breach or default or any of the <br /> terms, covenants, or conditions of this Contract to the City's satisfaction within the time <br /> period specified or the City shall have the right to terminate the Contract without any <br /> further obligation to the Contractor. Any such termination for default shall not in any way <br /> operate to preclude the City from also pursuing all available remedies against Contractor <br /> and its sureties for said breach or default. <br /> 1-08.10(10) Waiver of Remedies for Any Breach <br /> (******) <br /> In the event that the City elects to waive its remedies for any breach by Contractor or <br /> any covenant, term or condition of this Contract, such waiver by the City shall not limit <br /> the City's remedies for any succeeding breach of that or of any other term covenant, or <br /> condition of this Contract. <br /> I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.