My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> d. Horizontal and vertical locations of underground utilities and appurtenances, <br /> shall be referenced to monumentation. The monumentation shall be based <br /> on NAD 83-91 for Horizontal Datum and NAVD 88 for Vertical Datum. <br /> e. Any changes in centerline profile and curb & gutter (top of curb), offsets and <br /> elevations. <br /> f. Details, Equipment or materials used that were not shown on the original <br /> Plans. <br /> g. The actual arrangement and routing of conduit, embedded conduit, raceways <br /> and piping relative to its location and proportioned to other work. The location <br /> needs to be dimensioned on the record drawings. <br /> h. Contractor prepared piping schematics and diagram drawings representing <br /> the Equipment orientation. <br /> i. Final location of all surface and subsurface improvements. <br /> j. Record on the drawings the location of all field run materials. <br /> k. All shoring systems left in place at the end of construction. <br /> Contractor shall accurately show existing underground items including, but not limited <br /> to, piping, manholes, pull boxes, conduit, direct buried wire, foundations, equipment and <br /> obstructions found during construction on the record drawings. Note on the record <br /> drawings the actual size of all utilities and structures and types of material used. Locate <br /> all record drawing items by survey coordinates or dimensioned off NAD 83-91 for <br /> Horizontal Datum and NAVD 88 for Vertical Datum. Minimum requirements for accuracy <br /> are specified in the following chart. <br /> Description Horizontal Elevation Notes <br /> Location <br /> Gravity sewer and Coordinates, I.E. 0.01 ft. Recalculate actual slopes. <br /> drain lines stations, and All inverts in manholes. <br /> offsets 0.1 ft. All angle changes. <br /> Forcemains, Coordinates I.E. 0.1 ft. Record all angle points and <br /> watermains and and stations 0.1 finished ground elev. Above <br /> transmission lines ft. the invert elev. <br /> All other items, incl. 0.1 ft. 0.1 ft. Show dimensions on record <br /> Electrical and drawings. <br /> Structural <br /> Use red pen or pencil to make changes on the record drawings. Notations are to be <br /> neat, legible, clear and concise. <br /> Record information concurrently with the progress of construction. Conceal no work <br /> until the required information is verified and recorded. <br /> 1-08A1(3) Payment <br /> No separate payment shall be made for the preparation of record drawings. All costs <br /> associated with the preparation of record drawings shall be included in the unit contract <br /> prices of other items in the Contract. <br /> 1-09 MEASUREMENT AND PAYMENT <br /> 1-09.1 Measurement of Quantities <br /> Supplement 1-09.1 by adding the following: <br /> Measurement by the Ton: Where items are specified to be paid for by the ton it will be <br /> the Contractors responsibility to see that a certified weight ticket is given to the City's <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.