Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> and its sureties shall protect and hold the City, and Citys Representative, together with its <br /> officers, agents, and employees, harmless from any and all loss, defense cost, and expenses <br /> ' and against any and all demands made for such fees or claims brought or made by the holder <br /> of any invention or patent. Before final payment is made on the account of this Contract, the <br /> Contractor shall, if requested by the Owner, furnish acceptable proof of a proper release from <br /> all such fees or claims. <br /> 1-10 TEMPORARY TRAFFIC CONTROL <br /> 1-10.1 General <br /> 1-10.1(2) Description <br /> Supplement 1-10.1(2) as follows: <br /> Provide a uniformed off-duty Police Officer to control traffic for work at signalized <br /> intersections and other critical situations as determined by the Engineer. <br /> 1-10.2 Traffic Control Management <br /> ' 1-10.2(1) General <br /> Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the following: <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> ' supervisors by one of the organizations listed below: <br /> • Evergreen Safety Council (800) 521-0778 <br /> ' • Northwest Laborers Union (800) 240-9112 <br /> • American Traffic Safety Services Association (877) 642-4637 <br /> 1-10.2(2) Traffic Control Plans <br /> Delete the first paragraph of 1-10.2(2) and substitute the following: <br /> Contractor may use City's Standard Traffic Control Plans included in COE Standard <br /> Drawings, Series 700. The City does not represent or warrant that the Standard <br /> Plans are sufficient, adequate or complete for the Contractor's means, methods or <br /> plan of Work. If a new or additional Traffic Control Plan is necessary, prepare <br /> detailed Traffic Control Plan complying with COE Standard Drawings, Series 700, <br /> the MUTCD, Part 6, and the most current edition of the PROWAG (Public Rights- <br /> of-Way Accessibility Guidelines). Plan preparation shall be at Contractor's sole cost <br /> and submitted to the City for approval at least 14 calendar days before starting <br /> Work. Work may not begin until Contractor is in receipt of City approved Traffic <br /> Control Plan. <br /> 1-10.3 Traffic Control Labor, Procedures and Devices <br /> Delete 1-10.3 and substitute the following: <br /> 1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br /> (******) <br /> 1 1-10.3(1) General <br /> The Contractor shall provide all flaggers, signs and other traffic control devices. The <br /> Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br /> and other traffic control devices necessary to warn and protect the public at all times <br /> from injury or damage as a result of the Contractors operations that may occur on <br /> highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br /> ' all necessary signs and traffic control devices are in place. <br /> Flaggers and spotters shall possess a current flagging card issued by the State of <br /> Washington, Oregon, or Idaho. The flagging card shall be immediately available and <br /> shown upon request by the City. <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> ' WO No—UP3698 SP—125 <br />