My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> and its sureties shall protect and hold the City, and Citys Representative, together with its <br /> officers, agents, and employees, harmless from any and all loss, defense cost, and expenses <br /> ' and against any and all demands made for such fees or claims brought or made by the holder <br /> of any invention or patent. Before final payment is made on the account of this Contract, the <br /> Contractor shall, if requested by the Owner, furnish acceptable proof of a proper release from <br /> all such fees or claims. <br /> 1-10 TEMPORARY TRAFFIC CONTROL <br /> 1-10.1 General <br /> 1-10.1(2) Description <br /> Supplement 1-10.1(2) as follows: <br /> Provide a uniformed off-duty Police Officer to control traffic for work at signalized <br /> intersections and other critical situations as determined by the Engineer. <br /> 1-10.2 Traffic Control Management <br /> ' 1-10.2(1) General <br /> Delete the first sentence of the third paragraph of 1-10.2(1) and substitute the following: <br /> The primary and alternate TCS shall be certified as worksite traffic control <br /> ' supervisors by one of the organizations listed below: <br /> • Evergreen Safety Council (800) 521-0778 <br /> ' • Northwest Laborers Union (800) 240-9112 <br /> • American Traffic Safety Services Association (877) 642-4637 <br /> 1-10.2(2) Traffic Control Plans <br /> Delete the first paragraph of 1-10.2(2) and substitute the following: <br /> Contractor may use City's Standard Traffic Control Plans included in COE Standard <br /> Drawings, Series 700. The City does not represent or warrant that the Standard <br /> Plans are sufficient, adequate or complete for the Contractor's means, methods or <br /> plan of Work. If a new or additional Traffic Control Plan is necessary, prepare <br /> detailed Traffic Control Plan complying with COE Standard Drawings, Series 700, <br /> the MUTCD, Part 6, and the most current edition of the PROWAG (Public Rights- <br /> of-Way Accessibility Guidelines). Plan preparation shall be at Contractor's sole cost <br /> and submitted to the City for approval at least 14 calendar days before starting <br /> Work. Work may not begin until Contractor is in receipt of City approved Traffic <br /> Control Plan. <br /> 1-10.3 Traffic Control Labor, Procedures and Devices <br /> Delete 1-10.3 and substitute the following: <br /> 1-10.3 Flagging, Signs, and All Other Traffic Control Devices <br /> (******) <br /> 1 1-10.3(1) General <br /> The Contractor shall provide all flaggers, signs and other traffic control devices. The <br /> Contractor shall erect and maintain all construction signs, warning signs, detour signs, <br /> and other traffic control devices necessary to warn and protect the public at all times <br /> from injury or damage as a result of the Contractors operations that may occur on <br /> highways, roads, or streets. No Work shall be done on or adjacent to the roadway until <br /> ' all necessary signs and traffic control devices are in place. <br /> Flaggers and spotters shall possess a current flagging card issued by the State of <br /> Washington, Oregon, or Idaho. The flagging card shall be immediately available and <br /> shown upon request by the City. <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> ' WO No—UP3698 SP—125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.