My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-10.3(2) Maintenance and Protection of Traffic Control <br /> When the Bid proposed includes an item for "Maintenance and Protection of Traffic <br /> Control", the Work required for this item shall be to: <br /> 1. Furnish and maintain signs, cones, barricades, flasher, and other <br /> channelization devices; <br /> 2. Provide supervisory personnel for all labor for traffic control; <br /> 3. Provide labor and necessary vehicle(s) for set-up and removal of construction <br /> signs and the traffic control devices that are placed daily; <br /> 4. Provide labor and vehicles for patrolling and maintaining in position all of the ' <br /> construction signs and the traffic control devices; <br /> 5. Provide labor, material, and equipment necessary for cleaning up, removing <br /> and replacing all construction signs and traffic control devices that are <br /> destroyed, damaged or lost during the life of the project; <br /> 6. Provide flagging or use of police officers for the convenience of the <br /> Contractor, such as facilitating movement of equipment on the site, laying out <br /> or relocating traffic control devices and signs. <br /> 7. Cost associated with preparation and distribution of public notices involving <br /> parking, street access or traffic issues. <br /> Upon failure of the Contractor to immediately provide flaggers, erect, maintain, and <br /> remove signs; or provide, erect, maintain, and remove other traffic control devices when <br /> ordered to do so by the Engineer, the City may without further notice to the Contractor <br /> or the Surety, perform any of the above and deduct all or the costs from the Contractors <br /> payments. <br /> The Contractor shall be responsible for providing adequate flaggers, signs, and other <br /> traffic control devices for the protection of the worker and the public at all times <br /> regardless of whether or not the flaggers, signs, and other traffic control devices are <br /> ordered by the Engineer, or paid for by the City. The Contractor shall be liable for injuries , <br /> and damages to persons and property suffered by reason of the Contractors operations <br /> or negligence in connection therewith. <br /> 1-10.3(3) No Passing Zones , <br /> The striping of no passing zones that are to be obliterated in excess of 150-feet by paving <br /> operations shall be replaced by "Do Not Pass" and "Pass With Care" signs. The signs <br /> shall be located not less than 2-feet outside the usable shoulder nor less than 7-feet I <br /> above the edge of pavement. The number of necessary signs will be specified in the <br /> Special Provisions. <br /> The Contractor shall provide and install the signs and sign posts. The signs shall be <br /> maintained by the Contractor until construction operations are complete. When the <br /> project includes striping by the Contractor, the signs and posts shall be removed by the <br /> Contractor when the no passing zones are re-established by striping. , <br /> When the Contractor is not responsible for striping, the signs and posts shall be removed <br /> by the Contractor when the "No Passing Zones" are re-established by striping. Payment <br /> to perform the Work required for this subsection will be under the item "Maintenance and <br /> Protection of Traffic Control." <br /> 1-10.3(4) Traffic Control Labor <br /> The Contractor shall furnish all personnel for flagging to control traffic during construction ' <br /> operations. Flaggers shall have a current certification (Flagging Card) from the State <br /> Department of Labor and Industries (WAC 296-155-305). Employees of the Contractor <br /> engaged in flagging or traffic control shall wear reflective vests and hard hats. During I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—126 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.