Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> There shall be no separate classification of signs. All construction signs, whether used ' <br /> throughout the construction, during a major phase of construction or removed daily shall <br /> be paid under the item "Maintenance and Protection of Traffic Control." Portable or <br /> temporary mountings may require added weight for stability. If it is necessary to add <br /> weight to the signs, only a bag of sand that will rupture on impact shall be used. The <br /> bag of sand shall have a maximum weight of 40 pounds and shall be suspended no <br /> more than 1-foot from the ground. <br /> The Work to provide the construction signing shall be: <br /> 1. Furnishing all construction signs. <br /> 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 3. Initial installation and subsequent removal of all construction signs. <br /> 4. Furnishing labor and materials for maintaining the signs in a clean and <br /> presentable condition; <br /> 5. All other incidentals necessary for providing the construction signs according <br /> to the approved traffic control plan(s). , <br /> Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems <br /> to be unacceptable, while their use is required on the project, shall be replaced by the <br /> Contractor without additional compensation. ' <br /> 1-10.4 Measurement <br /> Delete 1-10.4 and substitute the following: <br /> 1-10.4 Measurement <br /> 1-10.4(1) General <br /> When the Bid Proposal does not include an item for any necessary traffic control, all <br /> costs for traffic control shall be included, by the Contractor, in the unit contract price for <br /> the various other items of Work in the Bid Proposal. The Contractor shall estimate these <br /> costs based on the contemplated work procedures. <br /> When traffic control items are included in the Bid Proposal, payment is limited to the <br /> following areas: <br /> The entire project area under the Contract and for a distance to include the initial warning <br /> signs for the beginning of the Project and the end of construction. Warning signs for <br /> side roads on the approved traffic control plan are also included. If the project consists <br /> of two or more sections, the limits will apply to each section individually. <br /> A detour provided in the Plans or approved by the Engineer for by-passing all or any <br /> portion of the construction, irrespective of whether or not the termini of the detour are <br /> within the limits of the Contract. <br /> The provisions of Section 1-04.6 will not apply to traffic control or traffic control items. <br /> However, the item "Maintenance and Protection of Traffic Control"will be considered for <br /> an equitable adjustment only when the total Contract price increases or decreases by <br /> more than 25 percent. <br /> The measurement and payment for the items included in the Bid Proposal for traffic <br /> control costs incurred within the limits of 1 and 2 above will be made to the Contractor <br /> by the City as described in these Special Provisions. <br /> I <br /> I <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—128 , <br />