My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> hours of darkness, white coveralls or white or yellow rain gear shall also be worn. The <br /> vests and other apparel shall be in conformance with Section 1-07.8. The Contractor <br /> shall furnish the MUTCD standard Stop/Slow paddles, except the minimum width shall <br /> be 24-inches, for the flagging operations. During hours of darkness flagger stations shall <br /> be illuminated to insure that flaggers can be easily seen without causing glare to the <br /> traveling public. The Contractor shall develop and use a method to ensure that flaggers <br /> have adequate warning of objects approaching from behind the flagger. <br /> All flaggers shall start a new job with an on-site orientation. This orientation must <br /> ' include, but not be limited to, the flagger's role and location on the job site, equipment, <br /> traffic patterns, communications and hazards specific to the work site. <br /> If off-duty uniformed police officers are not available for traffic control for Work within <br /> ' signalized intersections, Contractor may provide four flaggers. Flaggers are not <br /> permitted within the intersection. Each flagger shall control only one approach and be <br /> stationed near the stop bar. Provide a minimum of a series of three warning signs in <br /> ' advance of each flagger. Narrow multi-lane approaches to a single lane approaching <br /> the flagger. Provide and require all flaggers use two-way radios to signal each other to <br /> prevent conflicts and hold traffic when construction activities require. <br /> When the Bid proposed includes an item for "Traffic Control Labor," the Work covered <br /> by this item shall be for the labor actually used when authorized by the Engineer for: <br /> 1. The services of flaggers at both ends of a 2-way, single lane operation; or <br /> ' 2. The services of flaggers at signalized intersections if off-duty uniformed police <br /> officers are not available, or when otherwise specifically directed by the <br /> Engineer. <br /> The hours eligible for"Traffic Control Labor" shall be for the hours actually worked, plus <br /> 1 hour of on-site orientation per flagger. "Show-up time" will not be counted. The labor <br /> to perform the Work described in the item "Maintenance and Protection of Traffic Control" <br /> is specifically excluded from this Work. No adjustment will be made to the unit price for <br /> "Traffic Control Labor" for overtime or holiday hours worked. <br /> 1-10.3(4)A Traffic Control - Off-Duty Police Officer <br /> Provide off-duty uniformed Police Officer for traffic control at all signalized <br /> intersections. Acceptable sources for off-duty uniformed Police Officers are as <br /> follows in order of preference: <br /> 1. City of Everett Police Department, contact either, <br /> a. Officer Mike Bernardi, (425) 327-9119 <br /> b. Officer Mike Drake, (425) 244-0025 <br /> 2. Puget Sound Executive Service, 625 B 5th Ave, Ste 4, Sequim, WA <br /> 98382 <br /> a. Contact Nick Janssen, (360) 681-7737 <br /> 1 1-10.3(5) Construction Signs <br /> All signs required by the approved traffic control plan(s) as well as any other appropriate <br /> signs prescribed by the Engineer will be furnished by the Contractor and be paid under <br /> the item "Maintenance and Protection of Traffic Control." The Contractor shall erect <br /> them on posts or supports and maintain them in a clean, neat, and presentable condition <br /> until the necessity for them has ceased. All non-applicable signs shall be removed or <br /> l covered with either metal or plywood during periods when they are not needed. When <br /> the need for any of these signs has ceased, the Contractor, upon approval of the <br /> Engineer, shall take down these signs, posts, or supports. All signs, posts, and supports <br /> ' shall be removed from the project and shall remain the property of the Contractor. <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> 111WO No—UP3698 SP—127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.