My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> DIVISION 2 — EARTHWORK <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br /> ' 2-01.2 Disposal of Usable Material and Debris <br /> Supplement 2-01.2 by adding the following: <br /> When requested by the property owner, trim trees of sufficient size for fire wood, cut into <br /> two-foot rounds and neatly stack on adjacent property. Remove and dispose of stumps, <br /> large roots, limbs and branches. <br /> 2-01.2(1) Disposal Method No.1 —Open Burning <br /> Delete the first paragraph and substitute the following. <br /> Opening burning is not permitted within the city limits. <br /> ' 2-01.4 Measurement <br /> Delete all paragraphs of 2-01.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> ' described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-01.5 Payment <br /> 1 Delete all paragraphs in 2-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover clearing and grubbing, then clearing and grubbing shall <br /> ' be included with other work with no direct compensation made. <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> 2-02.1 Description <br /> Delete 2-02.1 and substitute the following: <br /> The Work shall consist of the removal, disposal or abandoning in-place of various <br /> ' existing improvements including, but not limited to, pavements, structures, pipe, curbs, <br /> curb and gutter, gutter, valves, manholes, catch basins and other items necessary for <br /> the accomplishment of the improvement. <br /> All Work with asbestos-cement pipe shall conform to the "Recommended Standard <br /> Asbestos-Cement Pipe Work Practice Procedure and Training Requirements," latest <br /> edition, as published by the American Water Works Association, Pacific Northwest <br /> Section. Remove and dispose of Asbestos-Cement pipe in accordance with the <br /> ' practices specified by the State of Washington Department of Ecology and the <br /> Snohomish County Solid Waste Division. <br /> 2-02.3 Construction Requirements <br /> 1 2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures <br /> Supplement 2.02.3(2) by adding the following: <br /> When removing structures such as manholes, inlets, or vaults that interfere with the <br /> construction, properly plug all pipe openings abandoned in-place watertight with <br /> Commercial Concrete, or with mortar and masonry, blocks or brick. <br /> Water Main Improvement"U" Division 2—EARTHWORK <br /> p October 1, 2019 <br /> WO No.—UP3698 SP—131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.