CITY OF EVERETT SPECIAL PROVISIONS ' <br /> 1 <br /> Backfill voids with suitable job excavated material where structures are removed. <br /> Compact suitable backfill material in accordance with 2-03.3(14)C. <br /> If the Engineer determines the job-excavated material unsuitable for backfill then <br /> Contractor shall obtain Gravel Borrow or CDF as directed, to complete backfilling <br /> the voids. If a pay item for Gravel Borrow or CDF is not included in the Proposal, <br /> then providing Gravel Borrow or CDF for backfill shall be considered as Extra Work <br /> under 1-04.4. <br /> 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> Delete 2-02.3(3) and substitute the following: <br /> 2-02.3(3) Removal of Existing Street Improvements <br /> (******) <br /> 2-02.3(3)A Description <br /> The Work shall consist of the removal and disposal of various existing <br /> improvements including, but not limited to, pavements, curb, curb and gutter, gutter <br /> and other items necessary for the accomplishment of the improvement. <br /> 2-02.3(3)B Removal of Pavement <br /> Remove full depth existing permanent type pavement and driveway pavement <br /> shown on the Plans or as directed by the Engineer. <br /> Replace, at no expense to the City, existing pavement designated to remain that is <br /> damaged during the pavement or concrete base removal. <br /> 2-02.3(3)B1 Sawcutting <br /> Make vertical full depth saw cut between existing asphalt concrete pavement, <br /> to remain and the portion to be removed. <br /> Where asphalt concrete pavement overlays cement concrete pavement base, <br /> saw cut in accordance with 2-02.3(6) Sawing and Line Drilling. , <br /> 2-02.3(3)C Removal of Curb, Curb and Gutter <br /> Remove existing curbs where shown on the Plans or where encountered in the <br /> Work and designated by the Engineer. <br /> Existing curb and gutter includes, but is not limited to, cement concrete, cement <br /> concrete curb with a brick gutter and a cement concrete back, or other combinations <br /> of rigid materials. Remove the entire curb and gutter section, regardless of material <br /> composition. <br /> 2-02.3(3)C1 Sawcutting <br /> Make vertical full depth saw cut between existing curb or curb and gutter to <br /> remain and the portion to be removed. <br /> 2-02.3(3)D Removal of Cement Concrete Sidewalks <br /> Concrete slabs that average four-inches or less in thickness will be considered as <br /> sidewalk removal. <br /> Protect existing concrete walk that is to remain in place, from equipment damage <br /> by using planking or cover with rock free eight-inch thick blanket of excavated soil. <br /> Provide Engineer with proposed pavement breakers before use and do not begin <br /> breaking pavement without Engineer's approval of the pavement breakers. ' <br /> Water Main Improvement"U" Division 2-EARTHWORK October 1, 2019 <br /> WO No.-UP3698 SP-132 <br /> 1 <br />